Clear 20′ span
Nothing stands inside holding up the roof, so every foot of the floor is yours to use.
The mistake we see most often with a 20×40 building is legs that are too short. Leg height is fixed once the building is up, and it is the specification buyers most often wish they had gone taller on. So decide it first, and when it is a close call and the extra cost is manageable, take the taller height.
The footprint itself suits narrow ground: 800 square feet, enough for two vehicles parked end to end or for one vehicle plus a long stretch of workshop. It is a frequent pick on lots where a building 30′ or 40′ wide would intrude on the side setback.
Call (252) 414-5105
Get a Free Quote
Picture two vehicles parked end to end, a long workshop, or a place for materials and a trailer. Across the 20′ width, nothing interrupts the floor, because the exterior columns take the roof load. That leaves all 800 square feet open, and it stays open however you rearrange things later.
Choose 12′ legs. With a building 40′ long, put the door in the gable end so you can drive straight through. This is the choice buyers regret most when they go too low, and it is the only one that cannot be altered after installation. When it is a close call and the extra cost is bearable, go with the taller.
On a building this long, we firmly recommend a vertical roof. Because its panels run the full slope, rain, leaves and snow slide off without horizontal seams to hold them. A regular roof on a long building collects debris in its valleys, which is where the trouble starts.
Begin with lengths. Figure on close to 20 feet for a crew-cab pickup, so two of them end to end would take the whole length. A bay boat of 22 feet needs 26 feet or more once the motor and the trailer tongue are added, and a camper may stand taller and run longer than either. Identify the longest item you own and the tallest, then leave space beside each so the doors open and you can walk around it.
Width is the other squeeze. Side by side, two vehicles are comfortable at 24 feet; in the 20 feet you have here they still go in, but every door needs care. Anything else on the floor, such as a mower, a freezer or a workbench, needs width of its own, so count it separately. Should a camper or tractor call for one tall door, settle that before ordering, because leg height costs far less at the time of the order than afterward.
Start with the ground itself. Before ordering, stake out the 20×40 on the lot with string, park a vehicle inside the outline for a day, and measure to the side setback. A narrow footprint is often chosen because a wider building would not clear that line, so it pays to see where the pad will sit while it is still only string.
You can still spot old wooden tobacco barns tilting in fields along the back roads that run from Wilson toward the coast. Their tall, narrow shape suited curing leaf, and for about a century they served as the region’s outbuildings. Steel replaced them on farms and behind houses, with wide clear spans, no posts inside and roofs that cope with a summer thunderstorm.
What people store has changed more than their need for space. Today that floor might shelter a boat that works the Pamlico, a camper, the side-by-side that comes out for deer season, or the equipment that goes with a crop of sweet potatoes or peanuts. To judge the size, start with the longest thing you own, allow walking room around it, and add one bay. Building too small is the regret customers mention most.
The price turns on how tall the legs are, which roof you choose, how many doors and windows are added, any certification your county requires, and the going price of steel coil. Since the panels are rolled at our own plant, a quote starts from today’s coil cost instead of a printed list that would be out of date. For a real number within 24 hours, phone (252) 414-5105 or send in the quote form.
It has 800 square feet. With a clear 20′ span and no interior columns, posts take up none of it, and the floor remains fully usable if the layout changes down the road.
Choose 12′ legs, and put the door in the gable end so you can drive through the full 40′ length. Legs cannot be lengthened after the building is erected, so be generous with this one.
Throughout NC, SC and VA, most counties want a permit for a permanent structure this size that sits on a foundation; coastal counties also impose wind-load rules. The details differ from county to county, so check with your building department. If it asks for certified engineered drawings, we will supply them.
Yes. We do not check credit for rent-to-own, and no bank is involved. The building is delivered first, payments are monthly, and settling early cuts the total cost.
Say what you plan to keep inside, name your county and tell us roughly what size you are picturing. Our figure is based on steel costs now, nothing obliges you to buy, and we will say so if another size fits the job better.