Clear 30′ span
Nothing stands in the middle of the floor, so all of it is usable.
A 30×40 building is the size we quote more than any other. It gives you 1,200 square feet, enough for a proper workshop, a garage for three vehicles or a place to keep equipment, and it works for most residential budgets while clearing the setback rules of most counties.
Call (252) 414-5105
Get a Free Quote
The usual answers are three vehicles, two vehicles with a full workshop alongside, or a tractor and its implements. The roof load travels down to the outside columns, so the middle of the floor stays open across all 1,200 square feet. Every foot of it can be used, and that remains true if you rearrange things later.
A 12′ leg is the usual choice, tall enough to clear a roll-up door 10′ high and still leave space for overhead storage. Choose 14′ when you might install a car lift. Buyers regret this choice more than any other, usually because they wanted taller legs, and it cannot be changed once the building is up. When two heights are close in price, take the taller one.
A building 40′ long does best with a vertical roof, and we recommend it firmly. Panels on a vertical roof run down the whole slope, so rain, leaves and snow are carried off rather than caught in horizontal seams. A regular roof on a long building gathers debris in its valleys, which is where the trouble begins.
On paper a building this size can look larger than it turns out to be, so work from real dimensions. A crew-cab pickup is close to 20 feet long. A bay boat of 22 feet on its trailer will take up 26 feet or longer once the tongue and motor are added, and a camper can exceed both in length and height. Take the longest and tallest thing you will store, then leave room around it to swing doors open and move about.
Doors matter for width as much as vehicles do. In 24 feet, two vehicles park side by side with space to spare; in 20 feet they still fit, though every door opening takes care. Any bench, mower or freezer needs its own width, so add it on top. Decide early if one tall door is needed for a camper or tractor, since the legs are far cheaper to raise at the time of ordering than at any later point.
When in doubt, lay string around the footprint in the yard and leave a vehicle parked inside the outline for a day. That shows quickly whether the quoted size is truly the one you need.
Land east of I-95 is flat, the soil is mostly sandy loam over clay, and groundwater is often just a few feet down. That makes excellent farmland: North Carolina leads every other state in sweet potatoes, and most of that crop is grown in counties like these. It also means the site deserves some thought before a slab is poured.
Visit the site once a heavy rain has passed and note where water stands. Fill the pad up above grade rather than excavating, compact the fill in lifts, and shape a slope so runoff leaves by itself. Sandy soil needs suitable anchors, and lower ground can lie within a mapped flood zone, so consult the county flood map before you fix the location of the 30×40. Get these details right and the building keeps the inside dry for decades.
Cost depends on the height of the legs, the roof style, the number of doors and windows, any county certification requirement, and the going price of steel coil. As we roll-form the panels ourselves, our figure comes from what coil costs today instead of a list that goes out of date. Call (252) 414-5105, or use the quote form, and a real figure follows within 24 hours.
It is 1,200 square feet. The 30′ width is free of columns, so you can use all of that floor and keep using it if the layout changes.
Most people are well served by 12′ legs, which leave room for a roll-up door 10′ high plus some overhead storage. Choose 14′ if a car lift may come later. The height cannot be raised after installation, so this is the place to be generous.
Most counties in NC, SC and VA ask for a permit on a permanent building like this one, and coastal counties impose wind-load requirements of their own. Rules differ by county, so ask your building department. When they ask for engineered drawings, we provide certified ones.
Yes. Our rent-to-own program needs neither a credit check nor a bank. We deliver, you pay monthly, and paying off early lowers what you pay in total.
Give us the size, the county and what the building will hold. The quote is worked out from steel prices as they stand now, it commits you to nothing, and if another size would suit you better we will tell you.