Clear 40′ span
Nothing inside holds up the roof, which keeps the full floor in use.
A 40×50 building has 2,000 square feet of open floor with not a single column in it. It is the step between a 40’×40′ and a 40’×60′: space for a proper workshop with its own storage area, or for light commercial use, and you do not have to commit to a 60′ length to get it.
Call (252) 414-5105
Get a Free Quote
The usual uses are a workshop with storage alongside it, a small commercial operation, or several vehicles with equipment. Across 2,000 square feet and a 40′ clear span, nothing inside has to be planned around, because the roof load travels down the outer columns. Every square foot is usable from the start, and that stays true if you reconfigure the space later.
Go for legs of 14′ to 16′. Before the slab is poured, work out where every door will sit. Legs are fixed for good once the building stands, and they are the dimension customers are most likely to wish they had made larger. If two heights tempt you and the extra cost is tolerable, take the taller.
Put a vertical roof on a building 50′ long; we are firm about that. Because the panels run straight down the slope, there are no horizontal seams to catch rain, leaves or snow, and they shed on their own. Long buildings with regular roofs tend to collect debris in the valleys, which is where problems begin.
Square footage can mislead, so work from real objects. A crew-cab pickup measures around 20 feet. A bay boat 22 feet long needs 26 feet or more with its trailer, counting the motor and the tongue, and some campers outdo even that in both length and height. The longest and the tallest of your belongings set the minimum, so add space for opening doors and walking around them.
At 40′ wide there is room to give each use its own zone. A pair of vehicles parked abreast needs about 24 feet to be comfortable. A freezer, a mower or a workbench takes room of its own, so measure each one separately and add it on top instead of assuming it fits between the vehicles. If one tall door is needed for a camper or tractor, settle that when you place the order, because raising the legs is far cheaper then than at any point afterward.
To test the plan, run string between stakes at the four corners and leave a vehicle inside the lines for a day.
The ground comes first. Out here east of I-95 the terrain is level, the soil is chiefly sandy loam resting on clay, and the water table often sits within a few feet of the top. Few places grow crops better: North Carolina leads the country in sweet potatoes, and most of that crop comes from these counties. The same ground deserves some planning before a slab is poured.
After a downpour, walk the lot and mark every spot where water has pooled. Raise the pad above the wettest of them rather than cutting into the ground, pack the fill down in layers, and shape the top so rain runs off by itself. Anchors have to suit sandy soil, and a low-lying lot can fall inside a mapped flood zone, so check where yours sits on the county flood map before deciding where the building goes. With those points handled, a steel building here should stay dry inside for decades.
The price depends on the leg height, the roof style, the number of doors and windows, any certification your county demands, and what steel coil costs when you ask. We run our own roll-forming line, which lets us base the figure on today’s coil price instead of a printed list that falls out of date. Phone (252) 414-5105 or fill in the quote form, and you will have a real number within 24 hours.
2,000 square feet. The 40′ span is clear, with no interior columns, so none of that floor is lost to posts and you can rearrange it whenever you like.
Order legs of 14′ to 16′ and plan where the doors go before the slab is poured. Legs cannot be raised once the building is installed, so when in doubt, be generous.
Probably. A permanent structure of this size standing on a foundation generally requires a permit across NC, SC and VA, and counties on the coast add wind-load requirements. Rules are set county by county, so ask your own building department what applies, and if engineered drawings are requested, we provide certified ones.
Yes, through our rent-to-own program. The building is delivered now and paid for monthly, nobody pulls your credit, no bank is involved, and paying it off early lowers the total cost.
Tell us roughly what size you want, which county the building is for and what you will keep in it. Our quote reflects steel prices today, asking costs nothing and commits you to nothing, and we will mention a different size if it would serve you better.