Clear 40′ width
With no columns inside, the full floor area is yours to use.
Choosing a 40×80 building comes down to one question: what is the biggest thing you will ever need to drive under the roof? At 3,200 square feet, this size covers equipment storage, contractor yards and light manufacturing, and the 40′ clear span means most farm and construction machinery moves through without dodging columns.
Call (252) 414-5105
Get a Free Quote
Contractor equipment, farm machinery, small-scale manufacturing and multi-bay service work all fit. With a 40′ clear span, the roof load runs down the outside columns, so you can set up the floor however you like today and rearrange it later without a post in the way.
No other specification is regretted as often as leg height, most often by people who wish they had gone taller, and it is fixed the day the building is installed. For equipment clearance, consider legs from 14′ to 16′, along with several large roll-up doors down the length. Torn between two heights and able to afford the difference? Take the taller.
A building 80′ long should have a vertical roof, and we recommend it without reservation. The panels run from ridge to eave, so rain, leaves and snow leave the roof instead of lodging in horizontal seams. On a regular roof, debris settles in the valleys, and at this length those valleys are where problems start.
3,200 square feet reads as generous on paper, but vehicles are longer than they look. Park a crew-cab pickup and you have used about 20 feet. A 22-foot bay boat on its trailer takes 26 feet or more with the motor and the tongue included, and a camper may be longer and taller still. Take the longest, tallest item you intend to store and allow space around it to swing a door and walk past.
Think about width as a door problem. In a 24-foot width two vehicles fit comfortably next to each other; at 20 feet the same two still fit, though you will open each door with care. If part of the floor goes to a workbench, a mower or a freezer, add its width on top. And settle early whether a camper or tractor needs one tall door, because leg height costs much less to settle at the time of ordering than afterward.
If you are still unsure, lay string around a 40×80 rectangle in the yard and use it for a day as though the building were already standing: park inside it, walk around, open the doors. That is the fastest way to learn whether the quoted size really matches how you will use it.
Begin with the paperwork, because it can change what you order. In most counties a building like this, permanent and on a foundation, needs a permit, and what certification an inspector asks for depends on the county. Ask the building department which drawings it requires and whether a wind-load requirement applies, as it does near the coast. Then pull up the flood map for your site, since every river and sound in this part of the state has its own flood zone.
That caution has a history. Floyd (1999), Isabel (2003), Irene (2011), Matthew (2016), Florence (2018) and Dorian (2019) all reached Eastern North Carolina, a few as wind and most as water. People here took one lesson from them: how well a building does depends on its anchoring and the ground beneath it.
Design wind speeds climb between I-95 and the coast. Give us the building’s location and we will price framing, anchors and drawings to suit it.
Leg height, roof style, the doors and windows you pick, and any certification your county insists on all affect the number, and so does what steel coil costs when you ask. We roll-form our own panels, so our quotes begin with current coil prices rather than a set list that quickly goes out of date. Send in the quote form or call (252) 414-5105, and an actual figure comes back within 24 hours.
That is 3,200 square feet, and none of it is lost to posts: the span is a clear 40′, so the full floor stays in use, including after any rearranging.
For equipment clearance, 14′ to 16′ is the range to consider, and several large roll-up doors along the length are worth thinking about. Legs cannot be extended after installation, which is why this is the dimension to be generous with.
In most NC, SC and VA counties a permit is required once a structure of this size is permanent and sits on a foundation, and near the coast the county adds wind-load requirements. Details vary, so your building department has the final word on what it needs. When it asks for certified engineered drawings, we supply them.
Yes. There is no credit check and no bank in our rent-to-own program. You take delivery, pay monthly, and can clear the balance early to cut the total you pay.
Tell us the footprint you have in mind, which county it is in and what the building must shelter. Prices follow today’s steel market, there is no obligation in asking, and if a different size would do the job better, you will hear it from us.