A clear 50′ span
No columns inside the walls, so the whole floor stays usable.
A 50×100 building has no posts inside it. The roof is carried on the outer columns across a clear 50′ span, so the whole 5,000 square feet of floor stays open. Racking, workflow and forklift routes can be arranged around the work instead of around a column, and you can rearrange them later without touching the structure.
Call (252) 414-5105
Get a Free Quote
This size suits warehousing, distribution, large-scale manufacturing and indoor equipment yards. Because the roof load is carried by the exterior columns, no part of the 5,000 square feet is given up to posts, and the floor stays fully usable however you reconfigure it later.
Where racks and forklifts will be working, eave heights of 16′ to 20′ give them room. Decide on dock-height doors when you place the order rather than afterward. Leg height is the choice buyers most often wish they had gone higher on, and once the building is up nothing can change it. If you are torn between two heights and the extra cost is manageable, take the taller.
At 100′ long, this is a building for a vertical roof, and we say so plainly. Laid top to bottom, the panels send rain, leaves and snow straight off the building, with no horizontal seams for them to settle in. A regular roof does the opposite over a long run: debris collects in the valleys, and that is where trouble starts.
Floor area looks generous until the vehicles come in. A crew-cab pickup measures roughly 20 feet long. A bay boat 22 feet long needs 26 feet or more once it sits on its trailer with the motor and tongue attached, and a camper may beat both for length and height. Take whatever is longest and tallest on your list as the minimum, and allow room around it for opening doors and walking all the way round.
Doors matter as much as width. Two vehicles side by side are comfortable in 24 feet, and they still fit in 20 if you are careful with the doors. At 50′ this building clears both figures, but a workbench, mower or freezer needs room of its own, so add its width separately. If a camper or tractor needs one tall door, decide that now, because leg height is far cheaper to specify at order time than to change afterward.
Still unsure? Mark the footprint out with string and stakes, and park inside the lines for a day. Then you will know whether the quoted size is the right one.
Let a heavy rain survey the site for you. Afterward, walk the ground and note where water stands, because that is where the pad should not go. Land east of I-95 is level, a sandy loam lying on clay, with groundwater often just a few feet below the surface. Farmers work some of the best soil in the country here, and no state grows more sweet potatoes than North Carolina, most of them in these counties. The same ground rewards some planning before you pour a slab.
Raise the pad above the surrounding ground instead of cutting into it, pack the fill down in layers, and grade it so water runs off by itself. Sandy soil calls for anchors suited to it, and low-lying ground may be inside a mapped flood zone, so look at the county flood map before you commit to a location. Get all of that right and a steel building in this part of the state will stay dry for decades.
Doors, windows, roof style and leg height all affect the price, and so do steel coil prices and any certification your county asks for. Because we roll-form our own panels, a quote reflects today’s coil cost instead of a price list that goes out of date. Phone (252) 414-5105 or use the quote form, and you will have a real number within 24 hours.
That is 5,000 square feet. With no columns breaking up the 50′ span, none of it is lost to posts, and moving things around later does not shrink it.
For racking and forklift work, 16′ to 20′ is the range, and dock-height doors are worth raising when you order. Legs cannot be lengthened once the building is up, which makes leg height the one specification to be generous with.
Probably. Counties in NC, SC and VA usually require a permit for a permanent building on a foundation at this size, and coastal counties add wind-load requirements on top. Each county decides for itself, so ask your building department. If it wants certified engineered drawings, we will supply them.
Yes. Under our rent-to-own plan there is no credit check and no bank involved. The building is delivered, you pay by the month, and paying it off early lowers what you owe in total.
Send the size you have in mind, the county and what will go inside. We price from steel as it costs now and you take on no obligation. If a different size would suit you better, you will hear that from us.