Agricultural Metal Building Prices

ECOPM53

Quote-Only · No Online Dollar Figures

Steel now stands where wooden tobacco barns once did across Eastern North Carolina, and anyone planning a new farm building soon asks what it will cost. This site gives no answer in dollars: you will find no figures, no ranges and no per-square-foot rates for agricultural metal building prices. We quote farm and ag buildings one at a time from our Farmville plant. What it costs follows from the clear-span width and length, the eave height, the openings, any lean-tos, and what your county requires for certification. There is no builder to hire, since we build and install. To start a quote, phone (252) 414-5105 or send the quote form.

Call (252) 414-5105

Get a Free Quote
Support

Quotes by phone or form

Phone (252) 414-5105, or send the quote form.

money_1

No prices posted online

A standing rule here: we never publish dollar figures or price ranges.

Reputation and Trust

No builder to hire

We build and install.

power 2

Steel from Farmville

Our agricultural steel is roll-formed at the Farmville plant.

money_1

What sets the price

Size, height, openings, certification and installation.

money_1

Rent-to-own option

Ask when you request a quote. Qualifying buildings need no credit check.

Gray barn-style metal garage with two doors and side lean-tos

Why we do not list dollar figures

Coil prices for steel change, counties differ in what wind certification they ask for, and two barns with identical footprints can need different doors and heights. A figure posted online would mislead more than it informs. Instead, call (252) 414-5105 or send the form, and we will itemize a quote, usually within 24 hours.

Very long white metal building with black wainscot

What goes into agricultural metal building prices

Several things set the figure: the width and length of the clear span, the eave or leg height your equipment needs, the door package and the roof style. Add any lean-tos for machinery or hay, plus the question of whether your county asks for sealed drawings. How far the site is from the Farmville plant or the Greenville lots, and how easy it is to reach, also affects delivery.

ECOPM14

Made in Farmville, set up by us

Farms in Eastern VA, Eastern SC and Eastern NC receive plant-direct steel along with professional setup. We manufacture the buildings and put them up; the Greenville lot is for walk-in sales and nothing more.

White barn-style metal building with black trim and lean-tos

Talking about financing without quoting prices

Rent-to-own is available, and qualifying buildings go through without a credit check, so raise it when you ask for a quote. Monthly dollar amounts are not advertised online either; the quote itself sets out the options for your building.

ECOPM28

Why agricultural metal building prices differ for the same footprint

Put two buildings of the same size side by side and their quotes can still be a long way apart. The causes are mostly local. One is wind. Your county’s design wind speed decides how the frame is built and anchored, and whether certified drawings are needed at all; the number gets higher the nearer you are to the coast. The other is the ground under the pad. A level, well-drained lot needs very little work, while a taller pad, grading or fill may be called for on a low spot.

The rest is up to you: the roof style, how tall the legs are, how many doors and how large, whether to insulate, and whether to pour a slab. Taller legs and bigger doors raise a quote faster than extra floor area does. Steel itself changes in price over the year. That is the reason we quote at today’s steel cost, rather than posting a chart that would be wrong within a month.

To get a real number quickly, bring three things: the address, rough dimensions and a list of what will be kept inside.

Gray metal barn with a wraparound lean-to porch

Agricultural buildings in Eastern North Carolina, from tobacco barns to steel

Old wooden tobacco barns still lean in fields on the back roads between Wilson and the coast. Their height and narrow shape suited curing leaf, and for about a century they were the working outbuildings of Eastern North Carolina. Steel has taken over from them, both on farms and in backyards. A steel building gives you a wide clear span with no posts in the way, and a roof that handles summer thunderstorms without complaint.

The need for cover has changed less than what goes under it. The same footprint might now hold a camper, a side-by-side for deer season, a bay boat bound for the Pamlico or the machinery for a peanut or sweet potato crop. When the right size is hard to judge, find the longest item you own, allow a walkway around it, and then add one more bay. Building too small is the regret we hear about most.

Specifications

  • Plant: Farmville, NC
  • Phone: (252) 414-5105
  • Quote path: Call or form — no published $
  • Sales lots: East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834

Common Questions

What should I expect to pay for an agricultural metal building?

That depends on the size, the openings and the certification, and dollar figures are not published here. Send the quote form or phone (252) 414-5105.

Is there a per-square-foot rate I can look up here?

No. A per-square-foot figure ignores height, doors and engineering. We quote what your particular building requires.

Will I have to hire a builder for a metal farm building?

Not for the steel building. We build and install it. Our number is (252) 414-5105.

Where is your plant located?

Our plant is in Farmville, NC. Greenville has walk-in display lots only.

A real figure within 24 hours

Tell us how big the building needs to be, which county it is going in and what it will hold. We price from today’s steel costs, there is no obligation, and if a different size would work better you will hear it from us.

Request a Quote Design It in 3D