Commercial Metal Buildings Greenville, NC

Large tan commercial metal building with a tall roll-up door

Greenville NC Lot · Farmville Plant

A common mistake with commercial metal buildings in Greenville, NC is starting from a residential garage and stretching it to fit a business. Light industrial work, warehouses and shops call for clear-span floor space planned for that use from the beginning.

The steel is roll-formed at our Farmville plant. In Greenville we keep a walk-in lot at 1046 Greenville Blvd SW. Choose supply-and-erect and we also put the building up, so no separate builder is required. Delivery is free within 100 miles, a range that spans Eastern SC, Eastern VA and Eastern NC. Dollar figures are not published online, so phone (252) 414-5105 or request a quote through the form.

Call (252) 414-5105

Get a Free Quote
Relocated

We erect it too

We put up our commercial clear-span steel ourselves, so no builder is needed.

power 2

Made in Farmville

The steel is formed at our Farmville plant. Nothing is manufactured in Greenville.

Locations

Walk-in lot

Come by 1046 Greenville Blvd SW in Greenville.

Support

Phone

Our number is (252) 414-5105.

delivery truck

Delivery at no charge

No charge within 100 miles.

money_1

Rent-to-own terms

A credit check is not required on qualifying buildings.

Customize

Custom to your site

Widths, heights, openings and certification are priced for your site.

Steel frame of a metal building going up, with a lift on site

Supply-and-erect: we build it too

We manufacture commercial clear-span packages, haul them to the site and erect them. Nobody else has to be hired as the builder for the steel itself. Questions go to (252) 414-5105.

Steel frame inside a large metal building

Clear-span space for Greenville businesses

Wide bays can hold equipment and inventory, eave heights can suit overhead doors, and lean-tos give covered staging space. If Pitt County or your insurer asks for a certified package, we provide one. Door openings and wind ratings are quoted for your site, not borrowed from a generic commercial brochure.

Large gray metal building with open equipment bays on a freshly graded site

Steel from Farmville, a lot in Greenville

Production stays in Farmville, and none of it happens in Greenville. What Greenville has is a walk-in lot, which is also our street address, 1046 Greenville Blvd SW in Greenville, NC 27834. Look over a sample there before you place an order.

Long white metal building with several walk doors

Nearby towns, quoted by phone or form

We serve Jacksonville, New Bern, Kinston, Rocky Mount, Wilson, Farmville, Ayden and Winterville, along with towns across Eastern NC, SC and VA that fall inside the free delivery range. A quote comes only by phone or through the form, and we put no dollar amounts, ranges or per-square-foot rates on the site.

Long white metal barn with arched openings along the side

Commercial metal buildings: the permits come before the steel

Ordering steel is the easy part of a commercial project. The approvals are slower, because the jurisdiction will want sealed engineered drawings for the specific site, zoning sign-off, and plans for parking and stormwater. If those conversations begin early, erecting the building is quick.

Two details unlock a real quote: where the building will stand and what it will be used for, because design loads change from county to county and with the use. Clear-span framing keeps the floor open for storage racks, vehicles or machinery, and the bays can be spaced to suit the doors you need.

Think about growth now. Build one end wall so it can be opened up later, or plan the lean-to so it can be closed in, and the business can add floor space without starting over.

Long dark metal building with three large doors on a gravel lot

Siting a commercial building in Greenville, on the Tar River

Greenville grew up beside the Tar River, and in 1999 Hurricane Floyd drove that river far past its banks; anyone living here then remembers it. The ground tells a similar story. Across this part of the inner coastal plain the land is level, sandy loam sits on clay, and groundwater lies nearer the surface than most newcomers would guess.

That is good news for sweet potatoes and tobacco and bad news for a concrete slab poured in the lowest corner of the site. Watch where rainwater ponds during a heavy summer thunderstorm, and choose a different spot for the building.

Two storms stand out: Floyd, and Matthew in 2016. Each arrived this far inland mainly as rainfall, and the Tar and the Neuse stayed high for days. Wind counts, but across most of Pitt County the priorities are drainage, a pad that carries water away, and anchors matched to the soil. Near a creek or the river, look at the county’s flood map before you pick a location; a few minutes with it can save you an insurance headache.

Specifications

  • Plant: Farmville, NC — roll-forming manufacturer
  • Walk-in lot: 1046 Greenville Blvd SW
  • Address: East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834
  • Phone: (252) 414-5105
  • Panels: 29-gauge standard, 26-gauge upgrade
  • Widths: 12’–60′ clear span
  • Delivery: Free within 100 miles
  • Region: Eastern NC · Eastern SC · Eastern VA

Common Questions

Can I buy a commercial metal building in Greenville, NC from you?

Yes. The steel comes from our Farmville plant, you can see samples at our Greenville lot, and installation is available. Phone (252) 414-5105.

Will I have to hire my own commercial builder?

Not for the steel building. With supply-and-erect, we install what we manufacture. Questions can go to (252) 414-5105.

Is the Greenville lot where the buildings are made?

No. They are made in Farmville; the Greenville site is a walk-in lot and nothing more.

What should I expect to pay for a commercial metal building in Greenville?

Size, height, doors and certification all affect it. Dollar figures are not posted online, so call (252) 414-5105 or request a quote through the form.

A commercial quote in 24 hours

Tell us how big the building needs to be, which county it is going into and what it will hold. The quote follows current steel prices and carries no obligation, and we will tell you if another size would work better for the job.

Request a Quote Design It in 3D