Drawings for plan review
Certified and sealed, so the structure is ready for your plan reviewer.
When you search for commercial metal buildings near me, these are the points you can check for yourself. We make the steel in Farmville, NC. We have 28 lots spread across Georgia, Virginia, North Carolina and South Carolina, and we put buildings up in all four states. A quote built on current steel pricing comes back within 24 hours, and the drawings that go to plan review are certified and sealed.
Clear spans reach 60 feet. The panels come off our own roll-forming lines, so we set the lead times ourselves instead of taking them from a distributor.
Call (252) 414-5105
Get a Free Quote
A late garage at home is a nuisance. A late warehouse delays every trade waiting behind it, and two weeks goes a long way down that line. Our panels are made on our own lines, not bought as finished stock, so when the industry is busy and resellers’ lead times swing, ours do not. You get a real date, plus early notice if it shifts, and that serves you better than a hopeful date you cannot plan around.
Interior columns fix the position of racks and the paths forklifts can take, and reworking a plan around them later is expensive or impossible. A clear span of 60 feet lets you lay the operation out as you want and change it again when the business does. The extra framing cost is typically earned back the first time you rearrange.
We provide certified drawings for the structure, and we make it, deliver it and erect it. The architect or general contractor you hire answers for how the finished facility meets code: utilities, foundations, accessibility, fire separation, egress and the occupancy classification. Drawing that boundary plainly is how commercial jobs avoid disputes at inspection.
Buying the steel is the quick part of a commercial project. Most of the waiting is for approvals: ahead of issuing a permit, the jurisdiction wants drawings engineered and sealed for the site, zoning approval, and answers on parking and stormwater. Begin that paperwork early and the erection itself moves fast.
Tell us the site address first. Near the coast the design wind speeds go up and flood elevation draws close scrutiny, and both change the framing and the foundation. Wherever the site is, clear-span framing keeps the floor free for racking, vehicles or equipment, and the bays can be spaced around the doors you need.
Allow for growth while you are planning. Build one end wall so it can be opened up later, or specify a lean-to that can be closed in, and a growing business can add floor area without starting again.
Level ground, a layer of sandy loam on top of clay and a water table only a few feet down are typical east of I-95. Farmers prize it: no other state grows as many sweet potatoes as North Carolina, and these counties produce most of them. Before you pour a slab on it, though, spend a little time planning.
Visit the site after a downpour and see where water stands. Build the pad up above the surrounding ground instead of cutting down into it, compact it in layers, and grade it so water runs off by itself. Sandy soil needs suitable anchors, and a low spot can sit in a flood zone on the county map, so check the map before building anywhere. Get all that right and the building should stay dry for decades.
The steel is manufactured in Farmville, NC, and we put buildings up in Georgia, Virginia, North Carolina and South Carolina. Phone (252) 414-5105 with the site address and what the building is for.
In almost every case, yes. Plan reviewers on commercial projects expect drawings carrying a licensed engineer’s seal, and ours are certified for the structure. Everything beyond it, meaning site work, foundations and compliance of the finished facility with code, stays with your architect or general contractor.
Erecting the steel is fast, often a matter of weeks rather than months. What stretches a commercial schedule is site work, plan review and permitting. We give you a firm date for materials, so your contractor can plan the other trades around it.
Begin with the clear width: it limits how racking and equipment can be arranged, and it costs the most to alter later. Length comes second and is much less expensive per square foot. Describe what the business does and we will propose a footprint.
Describe the building: roughly how large, which county, and what it will be used for. We quote at what steel costs today, asking costs nothing, and if the job calls for a different size, we will tell you.