Engineered and certified
Sealed drawings made for the plan review in your jurisdiction.
With commercial buildings, the claims worth trusting are the ones you can check. Our panels are rolled from coil at our own plant in Farmville, NC, there is a walk-in sales lot in Greenville, NC, and the drawings for each structure are certified for your jurisdiction. We build light industrial buildings, shops, workshops and warehouses, engineered to meet commercial code, with open clear-span interiors. And because we control the supply chain from start to finish, panels are not queued behind a distributor.
Call (252) 414-5105
Get a Free Quote
Buying a garage for your house and buying a warehouse for a business are different undertakings. On a commercial job the plan has to deal with occupancy class, exits, fire separation, accessibility rules and engineering that carries a seal. We provide drawings that are certified and stamped for your jurisdiction. Whether the completed facility meets code is for the architect or the general contractor on your project to answer. We state that limit openly, since projects go wrong when nobody is sure where it lies.
Interior columns in a warehouse fix the racking layout and the forklift routes for as long as the building stands. With a 60′ clear span you place racking where you want it and move it when the operation changes. A workshop gets the same benefit: overhead cranes and long lengths of stock travel with nothing in the way. Clear-span framing does cost a premium, but it is usually recovered the first time racking is redesigned.
Schedules make or break commercial work. Our panels are formed from coil in our own plant, so we are not subject to the lead-time swings that come with a national distributor. You get an actual date from us, and early notice if it changes, which is worth more than a best-case date that no schedule can be built on.
Most of the work in a commercial project is not steel. It is the approval process: the jurisdiction wants drawings sealed by an engineer for your site, zoning sign-off, a parking plan and an answer on stormwater before it will issue a permit. Open those files early, and the building can go up fast once they clear.
Location changes the specification too. Along the coast, designers apply higher wind speeds and look hard at how high the floor sits above flood level, and both feed into the framing and the foundation. For that reason we ask for the site address before anything else when we price a job. Inside, a clear span leaves room to lay out racking, park vehicles or position equipment with no columns in the way, and we can place the bays to line up with the doors you need.
Plan for growth now. Design one end wall so it can be opened later, or build a lean-to now and enclose it later, and a growing business can add floor area without starting from scratch.
Where the pad goes depends first on the soil. East of I-95 the ground is flat, mostly sandy loam over clay, with groundwater often just a few feet down. It grows excellent crops, and no other state matches North Carolina’s sweet potato harvest, most of which comes from these counties. A commercial slab on that ground repays some forethought before the concrete arrives.
Go to the site after a heavy rain and note where the water stands. Then raise the pad rather than cutting it into the ground, compact each layer as it goes in, and shape the surface so water runs off by itself. Sandy soil calls for suitable anchors, and low-lying land can fall inside a flood zone shown on the county’s map, so read that map before choosing the location. Handle those points and you will have a building that stays dry for decades.
Nearly always. Plan review on a commercial job calls for drawings sealed by a licensed engineer, and the certified drawings we supply cover the structure. Utilities, foundations, site work and code compliance for the completed building sit with the architect or general contractor.
Up to 60′ with no interior columns is our standard range, and that handles most warehouse and shop work. Heavier framing can go wider. If you need a particular clear width, tell us, and we will say plainly whether it fits our range or calls for a different building system.
Yes. We deliver and erect in Georgia, Virginia, South Carolina and North Carolina. The plant that roll-forms our panels is in Farmville, NC, and in Greenville, NC there is only a sales lot where customers can walk in. We prepare certified drawings for the jurisdiction the building will stand in.
Putting the structure up is fast, commonly a matter of weeks rather than months. The calendar is usually governed by permits, plan review and groundwork, not by the steel. We commit to a firm date for materials, so your GC can plan the sequence of work around it.
Send the size, the county and what the building will store. Our figures come from current steel pricing, you owe nothing for asking, and if a different size would be a better fit for what you are storing, you will hear it from us.