How to Compare Metal Building Manufacturers and Prices

Large gray metal building with glass overhead doors

Guide · Comparing Quotes · Manufacturers · Specs

Old wooden tobacco barns still lean in the fields along the back roads of Eastern North Carolina, and steel buildings have taken over their job. Anyone buying one soon finds that two quotes for what sounds like the same building can sit far apart, often for reasons that say nothing about value. One price includes installation and the other leaves it out. One is framed in 14-gauge steel and the other in 12-gauge. One comes with certified drawings while the other assumes you will never need any. This guide on how to compare metal building manufacturers and prices explains how a manufacturer differs from a dealer, which specifications really move the price, and how to bring every quote to like-for-like terms before you choose.

The short answer

For a fair comparison between sellers, request an itemized quote from each on one identical specification: the width, length and leg height, the roof style, the panel gauge and the framing gauge, each door and window, the colors, the certification and anchoring, and whether the price covers delivery and installation. Totals only become comparable when those items line up and each quote lists what it leaves out.

Call (252) 414-5105

Get a Free Quote
Diverse Product Range

One spec sheet for all

Certification level, colors, openings, roof style, gauges and dimensions all have to be identical across sellers, or the totals mean nothing.

Diverse Product Range

Who made the steel

Ask who formed the steel, who puts it up, and who takes your call once the job is finished.

Quality Assurance

Gauge in writing

The panels are 29-gauge. The galvanized framing is 14-gauge as standard, and 12-gauge is used where spans are wider or loads are higher.

delivery truck

Delivery and setup terms

Find out whether both are in the price and where the mileage limit falls. A price for the kit alone does not cover an installed building.

Quality Assurance

Certification

Do stamped wind and snow drawings come with the building? Will the seller say before you buy whether your site needs them?

Diverse Product Range

Exclusions in writing

Site prep, the slab, permits and interior finish sit outside every shell quote, so insist on seeing them listed.

Long white metal building with several walk doors

Manufacturer or dealer: who answers for the building?

The two kinds of seller work differently. A manufacturer forms the panels and fabricates the framing in its own plant, then sells what it made, frequently through lots of its own. A dealer sells buildings that someone else made and brings in an outside crew to put them up. Either can hand you a good building. What differs is who is answerable: when the manufacturer also installs, one company stands behind the steel, its delivery and the crew that installs it. We run ECOP that way. At 188 US 264 Alt, Farmville, NC, we roll-form panels from raw coil. Our 28 lots, spread over Southwest Virginia, Upstate South Carolina and North Carolina, sell them, and we deliver and install them, with no separate builder required. Whichever company you are comparing us with, ask it three things. Who made the steel? Who will put it up? Who do you phone if something is wrong once the crew has left? Get the three answers written on the quote.

Tall gray metal building with roll-up doors

Which specifications move the price most?

Floor area gets the attention, yet quieter items can swing a quote just as far. Start with the framing: most buildings use 14-gauge, and the thicker, costlier 12-gauge is usually specified where spans are wide, in hurricane counties and under mountain snow loads. The panels have a gauge too, and it should be written down; 29-gauge is the norm for a building like this. A vertical roof needs more framing and trim than a regular one, so it raises the price. Every opening carries its own framing and hardware, whether it is a roll-up door, a walk door or a window. Where the county requires certified engineered drawings, the engineering is billed on top. Taller legs, wainscot, added bracing and the colors you choose each show up as their own line. Outside the shell sit the extras: permits, a slab or footings, site preparation and all the interior finish. A quote that looks cheap has often left several of those out, so have each one itemized, even if its line reads zero.

Long dark metal building with three large doors on a gravel lot

How to compare metal building manufacturers and prices on one sheet

Write the building down on one page and give an identical copy to every seller. The page should list the width and length, the leg height and the roof style; the panel gauge and the framing gauge; the number and size of every door and window and which wall each sits on; the colors, surface by surface; whether you want wainscot; whether you want certification, along with your county’s wind and snow figures; the surface the building will be anchored to; and the delivery address. Then have every company price that identical building. Each should also say whether delivery and installation come with the price, how far they will travel before a charge starts, how the quote is calculated and how long it stays valid. Our quotes follow current steel pricing and typically arrive within 24 hours, and anywhere up to 100 miles from one of our lots, delivery and installation are free. As the quotes return, send back any that stray from your page, and set the exclusions beside each other. Only after that do the totals tell you something.

Very long white metal building with black wainscot

Questions that tell a solid quote from a vague one

Begin with the steel: where the panels are formed, and in what gauge. Then the framing: is it galvanized, and in what gauge? On cost, find out whether delivery and installation are in the price and whether a charge begins beyond a certain distance. Find out whether certified engineered drawings are part of the price, and whether the seller will say before you buy that your site needs them; we do. Ask for the deposit, the date the balance falls due and the cancellation terms. Ask for a list of what the finished building does and does not include, with the exclusions in writing. Because steel prices move, find out how long the quote holds. Ask if rent-to-own or some other way of paying is offered, and on which buildings. Last, request the address of a finished building near you that you can drive past. Any manufacturer with years of installs and 28 lots behind it should be able to name one. A vague reply to a clear question is your cue to keep looking.

Steel frame of a metal building going up, with a lift on site

Judging metal building manufacturers by their answers

Once the quotes are lined up, what remains is the company behind each one. Five things are worth asking every seller aloud, whatever its quote says. Who makes the steel, and where? Who does the installing? Will certified drawings for your county come with the building? Is the price in writing, with its scope stated, delivery, installation and anchors included? And is there a finished building nearby that you can go and see?

These are not questions only we can answer well. They are simply the ones we would put if the roles were reversed, and a plain reply to each is encouraging whichever company you choose. A seller who goes vague on the simple ones has told you something as well.

Long white metal building with black wainscot and a roll-up door

Buying steel in Eastern North Carolina after a big storm

Out-of-town crews follow every big storm that crosses the Carolinas or Virginia, going door to door. Plenty do good work. A few collect a deposit and are long gone before any steel arrives. That is the strongest case for a seller with a lot you can visit and a phone that gets answered.

Storms are also why wind and anchoring belong on the specification. Give every seller your county’s wind and snow figures, say whether you want certification, and name the surface the building will be anchored to, so that each quote prices the same thing.

Size belongs on that sheet too, and the uses here are broad: a side-by-side for deer season, say, or the equipment for a peanut or sweet potato crop. Take the longest thing the building must hold, allow room to walk around it, and add a bay. Building too small is the regret we hear most.

Specifications

  • ECOP plant: 188 US 264 Alt, Farmville, NC 27828
  • Lots: 28 in NC, Upstate SC and SW Virginia; Mon–Fri 9am–5pm, Sat 9am–1pm; /locations/
  • Panels: 29-gauge, roll-formed from raw coil
  • Framing: Galvanized 14-gauge standard, 12-gauge available
  • Widths: 12′ to 60′ clear-span, 9′ to 12′ legs
  • Quote: Current steel pricing, typically within 24 hours
  • Delivery: Free delivery and installation within 100 miles of any lot

Common Questions

Why can quotes for the same metal building differ so widely?

Usually the quotes are not for the same building. The openings, the roof style, the framing gauge, the certification and the delivery and installation terms are what tend to differ, and together they account for most of the spread. Put one written specification in front of every seller and read the totals only after that.

Does buying from a manufacturer always cost less than buying from a dealer?

Not necessarily. What a manufacturer that does its own installing offers is one fewer layer between you and the steel, and a single company to hold responsible. Price both kinds of seller against the same specification, with delivery and installation spelled out, and decide on what a finished, standing building costs, whoever is selling it.

Can I fairly compare a 12-gauge quote with a 14-gauge quote?

No, because they are different products. The 12-gauge frame is the thicker steel and carries a higher price than the 14-gauge standard, which makes a quote for one a poor match for a quote for the other. First settle which gauge suits your span, your wind zone and what your county asks for in certification, and then get every seller to price that gauge.

How long does a metal building quote stay valid?

That depends on the company, since the price of steel keeps changing. Put two questions to each seller: how the quote was calculated, and for how many days it stands. Our own quotes are based on current steel pricing and usually reach you within 24 hours; your nearest lot can tell you how long a specific quote remains valid.

What should be written on a metal building quote?

A good quote reads like the specification it was based on. Expect the overall dimensions and leg height; the roof style; the gauge of both the panels and the framing; each door and window, with its size and where it goes; the colors; how the building will be anchored; whether it is certified; what is said about delivery and installation; the deposit and when the balance is due; how long the price holds; and a written list of what is left out, such as the slab, permits and interior finish.

Can I look at a company’s finished buildings before I buy?

Yes, and it is worth the trip. Get the address of a finished building in your area and drive past it. Then stop at a sales lot, where you can see the panel finish, the trim and the doors from close up. Our 28 lots are open Monday through Friday from 9am to 5pm and on Saturday from 9am to 1pm, and /locations/ has the full list.

Our price for your specification within 24 hours

Send us the dimensions, your county and what you plan to keep inside, and we will price exactly that. The quote comes from current steel pricing and carries no obligation. If another size would serve you better, we will point that out before you decide.

Request a Quote Design It in 3D