Erected by our crew
Making the building and putting it up are both our work, so the steel needs no second contractor.
You can verify the basics of a custom metal building in Petersburg, VA without relying on our word alone. The 29-gauge steel is formed at our plant in Farmville, NC. Framing samples stand on our sales lots in Greenville, NC, open for you to walk around. And the price for your lot is a real number built on current steel pricing, not a figure from a catalog list. We serve Petersburg and the Tri-Cities of Virginia, where I-95 and I-85 come together, with Colonial Heights and Chesterfield County close by, and we quote it as a market of its own, not an extension of Richmond.
Our own crew erects the building we make, so you have no need of another contractor for the steel. Delivery is free to sites up to 100 miles from one of our lots, and Petersburg and the Tri-Cities typically fall outside that range, so call (252) 414-5105 and we will quote the delivery plainly. Our Greenville, NC location is for sales, and the plant is in Farmville.
Call (252) 414-5105
Get a Free Quote
ECOP makes the building, hauls it to your site and erects it. You can skip hiring a builder or any other contractor for the steel. Questions about how that works can go to (252) 414-5105.
Petersburg lies in the Tri-Cities of Virginia, at the junction of I-95 and I-85, with Colonial Heights and Chesterfield County close by. That is a different market from the dense Richmond metro area, so the quote we write is for Petersburg and not borrowed from Richmond. Each custom building is quoted from our Farmville plant to suit the lot you own near Petersburg: its length, its bay layout, where the doors go and what certification the site needs. A stock catalog item cannot do that.
Choose width and length in standard increments, and leg heights up to 20′. Roofs come regular, A-frame or vertical. Add-ons include windows, wainscot, framed openings, insulation and lean-tos. Tri-Cities garage and shop packages are common around Petersburg and Colonial Heights and out to the edges of Chesterfield, beside I-95 and I-85. Before you sign, we help you separate the structural options from the cosmetic ones.
Reach us at (252) 414-5105, or stop by 1046 Greenville Blvd SW in Greenville, NC 27834, the address of East Carolina Outdoor Products. Framing samples stand on the Greenville lots for you to walk around, and once you have seen them we ship from the Farmville plant to Petersburg and the Tri-Cities. Delivery costs nothing out to 100 miles from any ECOP lot, freight to Petersburg is quoted plainly, and we do deliver and install. Petersburg is its own market, apart from Richmond.
Begin with the inspector’s point of view. Where a permit is needed, the inspector looks for certified drawings that carry the permit’s address, so the framing and the way it is anchored must be worked out for your county, not lifted from a stock plan. If a seller can do that, the word custom means something.
Then see how far the dimensions can move. A good seller lets you adjust the leg height, the width and the length in small increments instead of forcing a leap to the next stock size, and puts the doors and windows where the driveway and the daily work call for them. Lean-tos are an inexpensive way to gain room: one bay left open along a side will cover your tractor, your boat or your firewood, and it costs far less than a wider building would.
Come with a rough plan: a sketch of the lot showing the driveway, which way the weather blows in from, and what you need to keep inside. We can start from that sketch, and the 3D designer is there too if you would like to test a layout yourself first.
Start with the paperwork, before the ground. Ask the office that covers your lot whether the building needs a permit and whether the inspector will want certified drawings; a permanent building on a foundation usually does need a permit, and we supply the drawings when they are requested. Then look at the flood map if your lot is close to any of the area’s rivers. Petersburg sits on the Appomattox River where I-95 and I-85 split. Storms in this corner of Southside Virginia are mostly about rain: in 1999 Floyd made the Blackwater River rise until downtown Franklin was under water, and what is left of a tropical system can still swell the James, the Appomattox, the Meherrin and the Nottoway.
Underfoot, the ground can change quickly. From the fall line to the North Carolina border, you can find Piedmont clay in one place and coastal plain sand a few miles on. Clay is a question of runoff and sand a question of anchoring, so find out which you have. In both cases the best money you can spend on a steel building goes into a compacted pad that drains well. The other concerns are humid summers, icy winters and wind sweeping over open farmland, which is why peanut and cotton farms and timber operations across the region have long chosen clear-span steel.
No. Making the building, bringing it to you and setting it up are all our work, so nobody else has to be hired for the steel. Reach us at (252) 414-5105.
East Carolina Outdoor Products can. The steel is roll-formed at our Farmville, NC plant, and from there it goes to Petersburg and the Tri-Cities of Virginia, out to Chesterfield and Colonial Heights. We treat that area as its own market, not as part of Richmond. Our main office is at 1046 Greenville Blvd SW in Greenville, NC 27834, and the number is (252) 414-5105.
No. They are manufactured in Farmville, NC. Greenville is where we have sales lots, and nothing is built there. Call (252) 414-5105 with questions.
Not for sites up to 100 miles from an ECOP lot, where delivery is free. Petersburg and the Tri-Cities are typically outside that radius, but we still deliver from our Farmville plant, and the quote is yours for a call to (252) 414-5105.
Permanent buildings on a foundation usually go through the permit process, and we supply certified drawings whenever an inspector asks for them. Questions: (252) 414-5105.
Not on buildings that qualify. Ask when you call (252) 414-5105.
Three details are enough for a price: the size, the county where the building goes and what it has to hold. We work from today’s steel pricing, you take on no obligation by asking, and should a different size suit you better, we will say so.