Open floor, edge to edge
Every width from 12′ to 60′ is clear-span, so no post in the middle forces your layout.
How much space do you actually get in a metal building? Almost all of the footprint, as long as the building is clear-span. Compare two garages of the same 30-by-40 size, one framed with wood and one built as clear-span steel. They do not offer the same room. Wood framing costs you inches to stud walls and often has a post or a bearing wall standing in the center. In the steel building the galvanized legs stand at the edges and the trusses cross the whole width, so nothing interrupts the floor.
On this page we cover how much of that footprint you can really use, how leg height turns floor area into volume you can stack things in, how partitions, lean-tos and door positions affect a floor plan, what the usual sizes hold in practice, and how to choose a size that will still fit in two years.
The short answer
In a clear-span metal building nearly all of the floor can be used, because nothing stands inside it and a wall consists of little more than the frame and one 29-gauge panel. Height adds room as well, for a lift, a loft or a tall door. What takes space away is the insulation you add, any interior walls and the swing of doors, and none of that is the structure.
Call (252) 414-5105
Get a Free Quote
Our buildings are 12 to 60 feet wide and nothing stands between the legs, so the floor runs clear from one wall to the other. The frame is galvanized tubing with the panel fastened over its outer face, which leaves a wall only a few inches deep until insulation and interior finishing are added. In a plain shop or storage building, almost all of the footprint you ordered can be used as floor: park on it, rack it, work on it. What you lose is what you choose to add, such as spray foam or batts, a stud wall to take drywall, and cabinets or benches along the sides. Conventional buildings are different, since a center post or bearing wall decides where vehicles and equipment can go. In steel, the width on the quote is very nearly the width you can use.
Floor area is only part of the picture, because people use a shop in three dimensions. On our buildings the legs measure 9 to 12 feet at the eave, and the pitched roof gives extra clearance toward the middle of the span. Nine feet is enough for cars, mowers and general storage. Go to 12 feet and you can fit a two-post lift, a boat or an RV on its trailer, or a mezzanine across part of the floor, and a lifted truck then needs a taller roll-up door. If the shell will become an office or a showroom, the added height keeps the ceiling feeling tall once insulation and drywall are hung beneath the trusses. With no post in the middle of the span, a loft can be placed wherever the layout needs one. You choose the leg height at the quote, before manufacturing starts, so pick it for the tallest thing you will ever bring inside.
Where you put the doors matters more than the dimensions. A roll-up door in the gable end means vehicles can drive straight through and park one behind another. Put the doors in the sidewall instead and you get bays that sit side by side, with both ends free for a bench or an office. Walk doors set near the corners keep the middle of a wall clear for shelving. A lean-to on one side gives a tractor, a stack of firewood or a patio a roof without cutting into the interior. A partition between an office and the shop floor is built by your own trades once the shell is up, so sketch it first and position the openings and windows to fit. Each of these is fixed once the steel has been rolled and installed, which is why we suggest trying layouts in the 3D builder before you request a quote.
Take a 20-by-30 first. It works as a two-vehicle garage with a workbench along the back wall, or as a one-vehicle garage with a large shop area. A 24-by-24 holds two cars side by side and leaves room to open the doors. The 30-by-40 is the classic shop: space for two or three vehicles and a lift bay, or for a truck and a boat with a wall of storage, or for the shop of a small contractor, with an office at one end. A 40-by-60 can house a four-bay shop, a small business or the equipment of a farm, with space to partition. Once the building is 60 feet wide, whatever its length, it is big enough for commercial or agricultural use, and the full width stays open. Nothing structural stands inside, so any of these layouts can be rearranged later.
Make a list of everything the building will hold, including what you expect to own a few years from now, and draw it all on graph paper with space to walk around each item and swing the doors. Include the workbench, the depth of any shelving along the walls and, if you will finish the interior, the thickness of insulation and interior walls. Then add another bay, or ten more feet of length, since the commonest regret is a building one vehicle too small. Base the leg height on your tallest item and ignore the average. We manufacture the building to the dimensions on your quote, meaning the width, the length and the height of the legs, then deliver and install it free of charge to any address within 100 miles of one of our lots. Rent-to-own, with no credit check, is offered on qualifying buildings. A quote built on current steel pricing usually comes back within 24 hours, which makes asking about the next size up a one-call job.
A floor plan on paper can look roomier than it is, because vehicles are long. Start with a crew-cab pickup, which runs about 20 feet. Put a 22-foot bay boat on its trailer and, with the motor and the tongue included, the length grows to 26 feet or more. A camper can top both of those in length and in height. Find the tallest and longest item you expect to park inside, and leave space to swing the doors and walk around it.
Width depends on doors as much as on vehicles. In a width of 24 feet, two vehicles sit next to each other comfortably. With 20 feet they still fit, though doors will need care. A freezer, a mower or a workbench takes its own slice of width, so count it separately. If a camper or a tractor means you want a single tall door, say so at the start: extra leg height costs much less on the original order than as an afterthought.
Before ordering, lay string around the footprint in your yard and live with it for a day, parking the vehicles inside the outline. That test tells you more than a floor plan does.
The land east of I-95 is flat, with soils that are mostly sandy loam sitting on clay and a water table that can be only a few feet below the surface. It makes some of the finest farmland in the nation: no state raises as many sweet potatoes as North Carolina, and most of the crop comes from these counties. Even so, the ground repays a bit of forethought before concrete is poured.
Go out after a downpour and mark the places where water stays. Raise the pad instead of excavating, pack the fill down in layers and give the surface a slope so water runs off on its own. Anchors have to suit sandy ground, and a low spot may be inside a mapped flood zone, which the county flood map will show before you commit to a location. Handle those points and a steel building here should stay dry inside for decades.
Almost. The stated width is measured at the framing, and a wall is only as thick as the galvanized tubing plus the panel, so the inside width lands very near the stated one. Insulation and any stud wall you build inside are what take it down.
Yes. Because no posts stand inside, a mezzanine or a loft can be placed anywhere you choose. Order 12′ legs if you want to stand up both above and below it, and have your own tradespeople frame the loft after the shell goes up.
The usual answer is a 30-by-40: two bays for the vehicles, a third for the lift, and 12′ legs to give a two-post lift enough clearance. Try the plan in the 3D builder, then ask for a quote on that size and on the next one up.
No. A lean-to sits outside the main span, along a sidewall, so the interior is unchanged. Ask at the lot whether one can be included in your quote, since it is designed together with the building and not bolted on afterward.
Length is settled at manufacturing and installation, and adding to it later is a project of its own. It is simpler, and usually cheaper, to order the additional length at the start.
Tell us the size you have in mind, the county and what you will keep inside. Our price comes from current steel costs, there is no obligation, and if another size would fit your plans better, we will say so.