Manufactured Metal Buildings

White metal building with open bays, with a truck and trailer alongside

Fabricated Before It Ships

Between Wilson and the coast, the old wooden barns once used to cure tobacco still stand in the fields, and steel is what farms and backyards put up now. Manufactured metal buildings are built at the plant as complete systems, with the framing sized to the loads that were calculated, the connections detailed and the panels cut to length before anything is loaded. By the time the truck arrives, putting the building up is assembly, not problem-solving on your property.

Call (252) 414-5105

Get a Free Quote
Quality Assurance

Engineered first

Loads are calculated and members sized to them, so nothing is guessed.

Diverse Product Range

Matched parts

Everything is cut and punched at the plant, so the pieces arrive made to fit one another.

Diverse Product Range

Quick to put up

Standard carports and garages often go up in a single day.

Relocated

Kit or full install

The building is the same either way. You decide who assembles it.

Quality Assurance

Certified plans

Sealed engineering is available when your plan review calls for it.

Diverse Product Range

A straight answer on fit

If another kind of building would serve your project better, we will tell you.

ECOPM54

What the factory settles before anything ships

The first job is working out the wind and snow loads at your location. Each framing member is then sized to those loads and no more, because adding steel only in case it is needed is how cost gets wasted. Connections are worked out in detail, holes are punched and panels are cut to the exact run, so every part has its place before the truck is loaded. That is the efficiency argument in full: making a building in a factory beats working it out on site.

Long white metal barn with arched openings along the side

Why manufactured metal buildings go up faster

On a site-built job, much has to be worked out as the crew goes along. A manufactured building comes as parts that already match one another, so putting up a standard carport or garage can often be done in one day. Commercial projects run the other way from conventional construction: permitting and site preparation, not the steel, normally control the timetable. That makes manufactured buildings a good fit for work with a firm deadline.

Steel frame of a metal building going up, with a lift on site

Kit or erected: who does the assembly

There are two ways to get one. In the first you buy the manufactured package and assemble it yourself, or hand it to your own crew, as many contractors and capable owners do. In the second we deliver the package, anchor it and erect it, and delivery plus installation cost nothing within 100 miles of any of our 28 lots. Either way the building is identical; what changes is who handles the assembly. We are happy with either arrangement, and we do not set a punitive kit price in order to nudge anyone toward installation.

White metal building with three overhead doors and a timber-framed entry

Where manufactured buildings fit, and where they do not

These systems work best for garages, workshops, warehouses, farm buildings and other jobs that need a clear, open floor more than a complicated design. They work badly for odd geometry, for designs that tie in heavily with masonry and for buildings with demanding architectural detail. When a project belongs in that second group we will say so plainly, since a manufactured system forced onto an unusual design ends up expensive and disappointing.

Large gray metal building with glass overhead doors

Manufactured metal buildings for commercial use: plan for the paperwork

A business owner pricing a manufactured building should expect the permit process, rather than the steel, to set the pace. Before it grants a permit the jurisdiction will ask for drawings sealed for the site, a zoning decision, and answers on parking and stormwater. Raise those questions at the outset and construction follows quickly once they are answered.

Near the coast two further factors come in: design wind speeds are higher, and flood elevation gets careful scrutiny. Each one changes the framing and the foundation, which is why we want the site address before we give a real price. A clear-span frame has no posts in the way, so racking, vehicles and equipment fit freely, and the spacing between bays can be matched to the doors the business needs.

Allow for expansion in the original design. If one end wall is planned to be opened up later, or a lean-to is planned so that it can be enclosed, a growing company can add floor space without replacing what it has already built.

White metal building with a new concrete apron

Siting a steel building in Eastern North Carolina

Begin with the pad. In the coastal counties, flood elevation draws close attention and bears on the foundation as well as the framing, so where the building sits should be settled before anyone discusses colors or door sizes.

The wooden barns that steel replaces were tall and narrow, made for curing leaf, and for about a hundred years they were the usual outbuilding across Eastern North Carolina. Steel has taken their place in farmyards and backyards alike. It gives wide clear spans with no posts inside, and its roof sheds a summer thunderstorm without complaint.

What goes inside has changed more than the need for shelter. A building like this might hold a boat for the Pamlico, a camper, the side-by-side that comes out for deer season, or the gear for a sweet potato or peanut crop. To pick a size, take the longest item you own, leave space to move around it and add one more bay. The most common regret we hear is a building that came out too small.

Specifications

  • Plant: Farmville, NC
  • Widths: 12′ – 60’+ clear span
  • Lengths: Any, 5′ increments
  • Framing: 14ga and 12ga galvanized
  • Panels: 29-gauge standard, 26-gauge upgrade
  • Supply: Kit or supplied-and-erected

Common Questions

What counts as a manufactured metal building?

It is a building made at a plant as a complete system before it is delivered. Loads are calculated for your location, the framing is sized to them, connections are detailed and panels are cut to length, so erecting it means assembling parts built to fit, not working things out on the site.

Do manufactured metal buildings cost less?

For the jobs they suit, which are garages, workshops, warehouses and farm buildings, they generally do. Members are sized precisely instead of over-specified, and the labor needed to erect them is much lower. On architecturally complex projects that saving disappears, and we will tell you when that is the case.

Can I put up a manufactured metal building on my own?

Yes. Contractors and owners with the skills often buy the package and assemble it with their own crew. If you would rather not, we can deliver, anchor and erect it for you at no charge anywhere within 100 miles of one of our lots. You get the same building whichever way you go.

How long does it take to erect a manufactured metal building?

With the site ready, a standard carport or garage can often be finished in a day. Bigger structures take more time. On commercial projects it is usually permits and site work, not the steel, that decide how soon the building is up.

Ask for a price, hear back in 24 hours

Give us a rough size, the county and what will be kept inside. The price that comes back reflects what steel costs now and carries no obligation. If another size would suit the job better, we will tell you.