What Safety Issues Should You Know About Metal Building Construction?

Gray barn-style metal garage with two doors and side lean-tos

Guide · Safety · Installation · Site Prep

What safety issues should you know about metal building construction? Begin with the ones you can see and check yourself. A steel building goes up fast, and that speed covers for real dangers: delivery trucks maneuvering near power lines and septic fields, roofing at eave height, anchors that must withstand a hurricane’s wind, gusts that turn loose sheets into sails, and panel edges sharp enough to slice through gloves. Most of the risk belongs to the crew, so a manufacturer whose own trained people do the installing has a strong case. The site, though, is the owner’s, and a surprising share of the problems start there. This guide covers what to know if you will be watching a crew or are thinking of doing the work yourself.

Short answer

The trouble comes from sharp panel edges that cut, loose sheets that the wind grabs, falls from the roof or the eave, anchors that are wrong for the surface and let go under uplift, trucks or lifts that touch overhead power lines at delivery, and ground that is unstable or unprepared. A trained crew, fall protection, a watch on the weather and ground that has been prepared properly deal with all of it.

Call (252) 414-5105

Get a Free Quote
Diverse Product Range

Sharp panel edges

Eye protection, long sleeves and gloves rated to resist cuts, plus a sweep of the roof and slab afterward to clear metal slivers.

sun

Wind and loose sheets

Fasten each panel the moment it is placed, weigh down the stack and stop when gusts build. Roof panels belong in the calm of early morning.

Diverse Product Range

Working at height

Eaves stand 9 to 12 feet up and the panels are slick, so the crew needs sound ladders, scaffold or a lift, and fall protection.

Diverse Product Range

Anchoring the building

Choose the anchor type and spacing to fit the surface and, where required, the certified drawings, then confirm each location afterward.

Diverse Product Range

Lines, septic and access

Point out overhead lines, give trucks a firm, level approach and mark the septic system and buried utilities before delivery.

Diverse Product Range

Proof of insurance

Ask for a certificate showing workers’ compensation and liability coverage that applies on install day.

Red metal building with open bays on a wide concrete slab

What safety issues do steel panels and wind raise in metal building construction?

One person can carry a 29-gauge panel, and that same panel is wide enough to behave like a sail. Let wind get under a sheet that has not been fastened and it can yank a worker off balance on the roof or whip around into someone standing below, while the edges cut through everyday gloves. That is why experienced crews read the forecast before they start, fasten each panel as soon as it is placed instead of leaving several loose, lay spare panels flat with a weight on them, and stop work when the gusts pick up. Afternoon wind is normal on the Carolina coast and along mountain ridgelines, so roofing gets done early. Installing a kit on your own? Make wind your main worry. Put no roof panels up in a breeze, wear cut-resistant gloves throughout, and never carry a sheet on its edge. Cutting and drilling leave metal slivers, so the roof and the slab need a sweep when the work is done.

Steel frame of a metal building going up, with a lift on site

Where does the risk of falling come in during an install?

A fall from the eave of a residential steel building, which stands 9 to 12 feet up with the ridge higher again, is enough to cause serious injury. The roof itself works against you. Panels are smooth and tilt down toward the eave, and dew, frost or the fine dust from cutting turns them slick. Until the panels are on, the purlins sit apart and offer nothing to stand on between them. So professionals set ladders correctly, work from scaffold or lifts at the eave, and wear fall protection that suits the height and the job. When you talk to an installer, ask how the crew handles roof height and whether its workers’ compensation coverage is current; if an uninsured worker is hurt on your property, the liability can land on you. Owner-builders should hear this plainly: on a taller building the roof is where most people ought to stop and hand the job to a crew.

Very long white metal building with black wainscot

Why does anchoring still matter after the crew has left?

Wind lifts a steel building instead of pushing it over, because the building is light for its size. Anchors are what keep it on the ground in a hurricane on the coast or a straight-line storm in the Piedmont, and inspectors examine them more closely than any other detail. They have to suit what they are fixed to. Concrete needs a slab thick enough, with enough space between the anchor and the slab’s edge. Ground anchors depend on soil that grips. Asphalt is a separate case altogether. Where the county requires certified engineered drawings, those drawings give the anchor type and spacing, and ECOP provides drawings certified for wind and snow loads wherever they are required, saying ahead of your purchase whether your site calls for them. When the building is finished, walk the base rail and check that every anchor location on the plan holds an anchor. A building that lifts in a storm becomes a danger to everything downwind.

White metal building with a new concrete apron

Which site conditions cause trouble on delivery and install day?

Delays and near-misses on delivery and install day come from the site more often than from the steel, and the site is the owner’s responsibility. Children and pets should stay well away from the work area throughout: panel edges, dropped fasteners and open trenches are all at ground level. A delivery driver also checks first for power lines along the driveway or over the pad. A truck with its bed raised, or a lift, close to a line puts lives at risk, so flag every line and clear the route ahead of time. Wet ground bogs trucks down, and Piedmont clay turns slick as grease, so give the truck a firm, level pad and a clear approach and you avoid a stuck truck and ruts in the yard. Mark septic tanks, drain fields, buried utilities and irrigation lines as well, so that heavy vehicles do not cross them. Ask the crew, in writing and before they come, what they need from you. ECOP delivers and installs, and having the site ready is the part that belongs to you.

Red metal garage with two roll-up doors and a carport lean-to

What should you check before and after the building goes up?

A short checklist helps at each stage. Ahead of install day, the pad should be level and firm, big enough for the building and for the crew to work around it. Find and mark buried utilities, septic components and property boundaries; note any overhead lines on the way in; take vehicles, equipment and debris off the footprint; and go over the weather forecast with the installer. While the crew works, keep people and animals at a distance and stay off the structure yourself. Once they have left, walk the base rail and verify that each planned location has an anchor. Look for fasteners that are loose or missing, and for any panel edge the trim does not cover. Sweep metal slivers off the slab, then check that the doors roll and latch. Keep the certified drawings with the installer’s contact details in one place, and where the county has issued a permit, book the final inspection promptly. Interior work such as electrical and plumbing is for you to hire out, and every trade brings safety rules of its own.

Tan metal garage with two roll-up doors and side lean-tos

Questions to settle before you order a metal building

Most buyers start with size and color, yet three questions that come earlier decide whether you are happy with the building a decade from now. The first is the site: pick the highest, best-drained spot that still allows access, and measure setbacks from the property lines, the well and the septic field. The second is the rules: ask the inspections office which permit and drawings a building of your size needs, and whether your parcel lies in a flood zone. The third is the use: write down everything the building will hold over the next five years, including things you have yet to buy.

With those answers in hand, the rest is mostly a matter of matching the building to the list. What you plan to store sets the width and length, the tallest item sets the leg height, and the amount of debris that falls on the roof settles its style: leaves, pine needles and rain run off a vertical roof best. Doors belong beside the driveway, not in whatever spot looks tidiest. Put your list in the quote form or bring it to the lot, and we will give you a real number.

Tan metal garage with two doors and an open lean-to

Permits, flood maps and ground in Eastern North Carolina

Start with the paperwork, because it can change where the building goes. Ask your county what permit a building of your size requires, and open the county flood map to see whether the parcel lies in a mapped flood zone, as low ground east of I-95 sometimes does. Settle both before you choose a spot.

Then look at the ground. Across this part of the state the land is flat, a sandy loam over clay, with groundwater often only a few feet below the surface, and the farmland here ranks with the best in the country. After a heavy rain, walk the site and see where water stands. Raise the pad instead of digging down, pack it in layers and grade it so water drains off. Sandy soil needs the right anchors, and with the pad and anchors done properly a steel building here stays dry for decades.

Specifications

  • Panels: 29-gauge steel, roll-formed from coil
  • Framing: Galvanized 14-gauge standard, 12-gauge available
  • Leg heights: 9′ to 12′ at the eave
  • Drawings: Certified wind and snow load drawings where the county requires them
  • Installation: ECOP, free within 100 miles of any lot
  • Owner prep: Level pad, clear approach, marked utilities, flagged lines

Common Questions

Is it safe to put up a metal building on my own?

A small open carport on short legs, built in calm weather by a careful owner with helpers and proper tools, is a reasonable project. Once the building is enclosed, the legs are taller or the job includes roofing, the danger from falls and wind rises sharply. Judge your own experience honestly, and think about paying a crew for just the roof even if you handle everything else.

Could a steel building be blown away in a hurricane?

One that is poorly anchored could. Because steel buildings are light, uplift from the wind is what they are designed against, and the anchors, chosen for the foundation and for the wind rating your county sets, are what keep the building down. The anchors are specified on certified engineered drawings, and once the building is up you should confirm that each location on them has one.

How should I deal with overhead lines near the place I want to build?

Note every overhead line on the delivery route and above the pad, and tell the installer before a truck is scheduled. The footprint has to be clear of lines. If one passes near it, check with the utility about clearance requirements before anyone sets a delivery date.

Does the owner have to be at the site while the building goes up?

You do not need to help, and you should stay off the structure, though it is useful to be within reach so the crew can ask where you want something placed. Children and pets belong away from the work area for the entire install. When the crew finishes, tour the completed building with them before they go.

Can handling metal building panels cause injuries?

Yes. A cut edge can slice through a thin glove, and drilled holes leave metal slivers behind. Wear cut-resistant gloves, long sleeves and eye protection around panels, carry sheets flat and not upright, and clear the slab and roof with a sweep after any cutting.

Ask for a quote and hear back in 24 hours

Tell us roughly what you plan to build, which county it is in and what it will hold. We price from today’s steel costs with no obligation on your side, and we will point out a better size if your answers suggest one.

Request a Quote Design It in 3D