Metal Building Cost

Tan metal garage at dusk with the lights on and cars inside

Cost · Quotes

Drive any back road across the coastal plain and the old wooden tobacco barns are still there, leaning in the fields. Steel is what people build now, and what a metal building costs here comes down to size, roof, doors, certification and distance, not to a figure copied from some website. We quote custom metal buildings installed, made in Farmville and sold from the Greenville lot, and because we put them up ourselves there is no builder to hire for the steel. You will see no dollar amounts on this page, since any we posted would be made up.

Call (252) 414-5105

Get a Free Quote
Reputation and Trust

No separate builder

We build and install the steel building ourselves, so you hire no one else for it.

Support

Our phone number

(252) 414-5105

Diverse Product Range

Where to find us

East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834

power 2

Plant location

Farmville, NC, not Greenville.

Relocated

Installed quotes

Prices are quoted for the building installed, not the kit alone.

money_1

What moves the cost

Size, roof, doors, certification and distance.

Support

Free quote by phone

Call us and ask for a free quote.

Gray metal building with a tall roll-up door

One company makes it and puts it up

Making the building, hauling it and erecting it on your site are all our work, so there is no outside builder or contractor to hire for the steel. Call (252) 414-5105.

White metal garage with cars parked in three open bays

What moves the cost of a metal building

Adding width costs more than adding length, because the framing for a clear span grows with the span. A vertical roof, extra roll-up doors, walk-in doors, insulation and certified wind drawings each add a line to the quote. So do a site beyond the free delivery radius and a site that is hard to get to. The same rules apply to our metal building prices and steel building prices pages.

Steel frame of a metal building going up, with a lift on site

Installed price against a kit-only advertisement

A kit-only advertisement looks cheaper until you have to pay a crew to put the kit up. Our quotes cover manufacturing, delivery and setup within 100 miles of any ECOP lot, so you are comparing like with like. Concrete, electrical work and permits are separate when your project calls for them.

ECOPM54

How to get your number

Phone (252) 414-5105 with the width and length you prefer, the roof style, the number of doors and your county. You can also visit East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834.

Gray metal garage with a carport lean-to on a concrete pad

Why the cost of one metal building is not the cost of another

Start with the coast. How close you are to it affects the design wind speed your county sets, and that speed shapes the framing and anchoring and decides whether certified drawings are needed. Then look down. A lot that is level and drains well needs little work, while one that sits low may call for fill, regrading or a raised pad before a building can go on it.

The choices that remain are yours: roof style, leg height, how many doors you want and how wide, insulation, and whether to pour a slab. Doors and wall height raise the total faster than floor area does. Steel prices also shift through the year, so we work from current pricing and avoid posting a chart that would soon be wrong.

Before you call, have the address, the approximate size and the intended use in front of you; with those, a number follows quickly.

Gray metal garage with an attached carport

From tobacco barns to steel across Eastern North Carolina

Old wooden tobacco barns still stand, many of them leaning, in fields along the back roads from Wilson to the coast. Their height and narrow shape came from curing leaf, and they served as the typical outbuilding in Eastern North Carolina for a century. Steel is what gets built now, on farms and behind houses alike: frames with wide spans and nothing in the middle of the floor, under roofs that cope with a summer thunderstorm.

What people keep in them has changed more than the reason for having them. On the same footprint you might now keep a camper, a side-by-side for deer season, a bay boat for the Pamlico, or the machinery for a sweet potato or peanut crop. To size it when you are unsure, start with the longest item you own, leave space to circle it on foot, and finish with an extra bay. The complaint we hear most is that people built too small.

Specifications

  • Phone: (252) 414-5105
  • Plant: Farmville, NC (not Greenville)
  • Address: East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834
  • Quote: Often within 24 hours
  • Delivery: Free within 100 miles
  • Model: Installed custom steel

Common Questions

Will I need to hire a separate builder for an ECOP metal building?

No. We manufacture the building, deliver it and put it up, so the steel needs nobody else. Call (252) 414-5105.

Are the buildings made at your Greenville location?

No. Nothing is manufactured in Greenville, NC, where we have sales lots only. The plant is in Farmville, NC. Call (252) 414-5105.

Why do you not publish metal building cost ranges on this page?

A range posted without a real site behind it misleads buyers. Call for an installed quote that matches the options you choose.

What do you need to know to give me an accurate cost?

The size, the roof, the doors, the county and whether certification is needed. Call (252) 414-5105.

Does the cost include installation?

A standard quote includes delivery and setup within 100 miles of any ECOP lot.

Where is your plant, and where can I visit?

The plant is in Farmville, NC. Our lot is East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834.

A real number in 24 hours

Tell us the size, your county and what it will hold. We price from current steel costs, asking obliges you to nothing, and should a different size work better for what you are storing, we will tell you plainly.

Request a Quote Design It in 3D