Metal Building Erectors

Charcoal metal garage with two roll-up doors and a lean-to

Build & Install

As a metal building erector, ECOP does something most sellers do not: the crew that puts your building up works for the same company that roll-forms the steel in Farmville. Nothing passes to a subcontracted crew, so there are fewer surprises on your site, and a single phone call covers both manufacturing and erection.

Put plainly, ECOP is vertically integrated. The steel is formed at our plant in Farmville, NC, taken to your site and erected by us, so no other builder or general contractor has to be brought in for the steel building. Our service area is NC, SC and VA.

Call (252) 414-5105

Get a Free Quote
Relocated

Maker and erector in one

Steel formed in Farmville and set up by our own crews, all under a single contract.

Reputation and Trust

No general contractor

We manufacture, deliver and install, so the steel building needs no other contractor.

delivery truck

Free delivery inside 100 miles

Measured from any of our 28 lots in NC, SC and VA.

Quality Assurance

Stamped drawings for permits

Counties that require a permit get stamped engineering from us.

money_1

Pay month by month

Rent-to-own needs no credit check, so the building can arrive first and the payments follow monthly.

Support

Quotes within 24 hours

Phone (252) 414-5105 or send the quote form. The figure comes from current steel coil pricing.

Steel frame of a metal building going up, with a lift on site

What a metal building erector does on your site

The erector’s work starts when the framing is unloaded and ends when the building is closed in against the weather. In between, the anchor bolts are set, the columns and rafters are raised, the purlins and girts are fastened, the walls and roof are covered with sheeting, and the doors and windows are hung. Plenty of metal building suppliers hand over the kit and let you or an outside crew do the erecting. We hold manufacture, delivery and erection in a single contract.

White metal building with a new concrete apron

Why one company for steel and erection matters

If the people who cut and formed your panels are the people fitting them, a problem with fit is dealt with on site, there and then, instead of turning into a warranty call afterward. The Farmville plant works from current coil pricing, so your quote follows what steel actually costs, not a national price sheet that gets revised each quarter. Erection is booked for when your slab is ready, not for whenever an outside subcontractor happens to have an opening.

Inside a clear-span metal building showing the steel frame and concrete floor

Certified drawings where the county requires a permit

In many counties across NC, SC and VA the building official will not issue a structural permit until certified drawings are in hand. When your jurisdiction asks, we supply stamped engineering covering wind load, snow load and the anchor bolt plans. Raise certification when you phone for a quote.

Large gray metal building with open equipment bays on a freshly graded site

Questions to ask any metal building erector before you pay a deposit

Out-of-town crews turn up on doorsteps after every major storm across the Carolinas and Virginia. Some of those crews do good work. Others collect a deposit and are gone, three states over, before a panel has been delivered. That is the case for dealing with a company that has a real lot you can visit and a phone that gets answered.

A handful of questions separates dependable sellers from careless ones. Can you go and look at a finished building nearby? Where is the steel manufactured, and by whom? Who does the installing? Will you receive certified drawings that suit your county? Is the price in writing, with the scope spelled out to cover delivery, installation and anchors?

None of this is peculiar to us. These are simply the questions we would put to a seller if we were buying, and if the answers come straight, that is encouraging, whichever company you choose.

White metal building with a porch on a new concrete pad

Eastern North Carolina ground: getting the slab ready for erection

Erection starts on your slab, so the ground comes first. In the flat country east of I-95 the soil is sandy loam over a layer of clay, and water often sits within a few feet of the surface. That suits farming, and it is a reason to plan before any concrete is poured.

Stand on the site after a downpour and see where the water collects. The sound approach is a pad built up above grade rather than dug into the ground, compacted in layers and sloped so the water leaves by itself. Sandy soil needs anchors matched to it, and a low spot may sit inside a flood zone shown on the county’s map, so consult it before the position is chosen. Handled properly, these steps keep the building dry for decades.

Common Questions

Do I have to hire another contractor to erect my metal building?

No. We build and install the steel building ourselves, so there is no erection contractor to hire. Our number is (252) 414-5105.

In which areas does ECOP erect metal buildings?

We erect across NC, SC and VA, anywhere within delivery range of our 28 lots. That includes Upstate SC around Anderson, Easley, Greer, Inman and Williamston, where delivery is free within 100 miles.

Does ECOP manufacture its buildings in Greenville, NC?

No. Our plant stands in Farmville, NC, and Greenville is the location of our main lot and office. Call (252) 414-5105 with any questions.

Describe the building, get a number in 24 hours

Describe the building: its size, the county it will stand in, and what it is for. A figure from current steel coil pricing comes back to you with no obligation attached, and we will mention it if a different size would work better.

Request a Quote Design It in 3D