Metal Building Installation

White metal garage with three roll-up doors

Included, Not Extra

The decision you face with metal building installation is one of timing: have the site ready before we arrive, and call us before you pour any concrete. Within 100 miles of one of our 28 lots, the installation itself costs nothing, so it never shows up as a separate line after you have committed to the building. We make the steel, deliver it, anchor it to your site and erect it, which leaves a single company answerable for the result if anything fails to line up.

Call (252) 414-5105

Get a Free Quote
Diverse Product Range

Free within 100 miles

Nothing extra for any site within 100 miles of our 28 lots in NC, SC and VA.

Diverse Product Range

One company in charge

We manufacture the building, bring it to your site and put it up, so a single company is answerable for the whole job.

Diverse Product Range

Anchors matched to your soil

Each site gets anchors chosen for its ground, not a standard spec applied everywhere.

Diverse Product Range

Slab layout supplied

Call us before you pour concrete and we will give you the anchor layout.

Diverse Product Range

Often one day

Standard carports and garages often go up in a day.

Diverse Product Range

Limits spelled out

Site preparation is not part of installation, and we say so up front.

Steel frame of a metal building going up, with a lift on site

What free metal building installation covers, and what it does not

Free installation means that we deliver the building, anchor it and erect it at no charge, provided the site is prepared and no more than 100 miles from one of our lots. Preparing the site is a separate matter: grading, concrete, utilities and tree clearing are for you or your contractor to handle. Some sellers promise free installation and then bill extra once they decide a lot is a ‘non-standard site’, counting on how vague the term is. We would rather state the limits here in plain words.

Gray metal garage with a carport lean-to on a concrete pad

What the site needs before we arrive

A site is ready when the ground is reasonably level, a delivery truck can get to it and nothing hangs over the spot where the building will stand. If the building is going on concrete, the slab should be cured and sized to the building, so ask us for the anchor layout before you pour. A lot that needs grading is not a problem, but the grading should be finished before we arrive, so that nobody finds out on delivery day.

Inside a large clear-span metal building with both ends open

Anchoring depends on the site

The choices are rebar anchors in the ground, asphalt anchors, or wedge anchors in concrete, and the right size depends on your soil and on how exposed the site is. A tall structure such as an RV cover takes far more wind than a low carport and needs anchoring to match. An installer who never asks about your soil or exposure is going by a standard spec and hoping for the best.

White metal building with a new concrete apron

How long installation takes

On many jobs a standard carport or a single garage is finished in a day. Bigger buildings need more time. For commercial structures the schedule is usually set by permits and site work, not by the steel itself. You get a real date when you order, and if it moves we tell you early instead of leaving you to wait for a crew that does not turn up.

White metal building with a tall RV-height lean-to

Questions to ask any metal building installer

When a big storm has passed through the Carolinas or Virginia, crews from out of town start going door to door. A few of them do honest work. Others collect a deposit and disappear before any steel shows up. If you want protection against that, buy from a business with a lot you can visit in person and a phone line that gets picked up.

Put a few questions to any seller you are considering. Where is the steel manufactured, and by whom? Who does the installing? Are the drawings certified for your county? Is the price in writing, with its scope stated and with delivery, installation and anchors itemized? Is there a finished building close by that you can go and look at?

We are not claiming these questions for ourselves. They are the ones we would ask from the buyer’s seat, and whichever company you choose, a direct answer to each is a good sign.

Open metal carport on a concrete pad

What Eastern North Carolina ground and storms demand of an installation

Ground comes first. Whatever the building, the pad has to be reasonably level, a truck has to be able to reach it, and nothing can hang above where the structure goes. The anchors are then matched to the soil underneath and to how open the spot is to the wind. People here have learned from the storms that anchoring and ground decide how well any building holds up.

More tropical weather reaches Eastern North Carolina than nearly any other part of the East Coast, and people still remember Floyd (1999), Isabel (2003), Irene (2011), Matthew (2016), Florence (2018) and Dorian (2019). Some arrived as wind, but most arrived as water.

Between I-95 and the coast, design wind speeds climb the nearer you get to the water. Every river and sound has a flood zone alongside it. Which certification the inspector wants depends on the county. Because of all this, our first questions are about your site, and colors come up later. Give us the location and we will quote framing, anchors and drawings that suit it.

Specifications

  • Included: Delivery, anchoring, erection
  • Not included: Grading, concrete, utilities, clearance
  • Free radius: 100 miles from any lot
  • Anchor types: Ground rebar, asphalt, concrete wedge
  • Typical time: One day for standard carports and garages
  • Coverage: NC, SC, VA, GA

Common Questions

Does the price of a metal building include installing it?

Yes. Any site within 100 miles of one of our 28 lots gets delivery, anchoring and erection at no charge. Site preparation, such as grading or concrete, is separate. To confirm your address is inside that radius, call (252) 414-5105.

What will it cost to have a metal building installed?

Nothing, for a site within 100 miles of any lot. Past that distance we price it as its own line, by distance, where you can see it, instead of hiding it in the cost of the building.

How level does the ground have to be before installation?

Reasonably level, with a clear route for the truck and nothing overhead. Some slope can be handled, but it changes the job. Describe the site when you order, not on delivery day, since that is the biggest source of surprises.

Will my metal building need a concrete slab?

It depends on what you are building. A carport or many farm structures can stand on level ground held by rebar anchors, whereas an enclosed garage, or any building that needs a permit, generally calls for a slab. When a slab is part of the plan, ask us for the anchor layout before you pour so the concrete is cut to suit the building.

How long does a metal garage take to put up?

When the site is ready, a typical single or double garage can often be erected in a day. Larger and taller buildings take longer. When you place the order we give you a real date.

A real number within 24 hours

Let us know the size of the building, your county and what will be kept inside. The quote reflects present steel pricing and carries no obligation, and if a different size would suit you better we will say that plainly.

Request a Quote Design It in 3D