What’s Included in a Metal Building Kit vs What You Buy Separately?

White metal garage with black trim and two roll-up doors

Guide · Kits · Scope of Supply

You are holding two quotes for a building of the same size, and the numbers look nothing alike. Before you choose between them, work out what’s included in a metal building kit vs what you buy separately. One quote may amount to a stack of steel parts on a pallet, while the other describes a completed shell already on your property. The sections below cover the contents of a typical kit, what it leaves out, how a building the seller makes, hauls and erects changes the comparison, which extras belong on the first quote, and the questions to put to each seller before you sign.

In short: a kit normally brings assembly drawings, fasteners, trim, wall and roof panels and the galvanized framing, and that is about all. The foundation, site preparation, permits, insulation, electrical work, plumbing, interior walls and the labor to put it up are almost never part of the price. Our building is not a kit. We manufacture the shell, deliver it and install it, and finishing the interior stays with the buyer.

Call (252) 414-5105

Get a Free Quote
Customize

A kit is steel only

The box holds drawings, fasteners, trim, panels and framing. Anything beyond that is bought or hired on its own.

Diverse Product Range

The foundation is yours

Someone has to design the slab, footings or gravel pad, grade the ground and finish the surface before anchoring begins, and that someone is you.

Customize

Doors are often optional

Ask whether the quote lists roll-up doors, walk doors and windows, instead of assuming they come with the building.

Relocated

Installed by us, no builder

We manufacture, deliver and install the structure, free of charge for any site within 100 miles of one of our lots.

Diverse Product Range

Interior finishing stays yours

Whichever way you buy, your own trades handle drywall, electrical, plumbing, HVAC and insulation.

Diverse Product Range

Settle extras before rolling

Colors, lean-tos, door sizes and leg height are fixed once the panels are cut, so put them on the first quote.

Four-bay metal garage with the doors open

What does a typical metal building kit contain?

Think of a kit as structure plus skin. The structure is galvanized steel framing: legs, trusses or rafters, base rails, hat channel or purlins, and bracing, all pre-punched and cut to suit the size you ordered. The skin is roof and wall panels of 29-gauge steel cut to length, a ridge cap, and trim at the eaves, gables, corners and base in the colors you picked. Fastening comes from bolts at the frame connections, self-drilling screws fitted with sealing washers, and closures, either strip or foam, at the eave and ridge. Most kits ship with assembly drawings. If you ordered them, you also get engineered drawings certified for snow and wind loads. Some kits list roll-up doors and walk doors as separate items, but plenty leave them out until you add them. Each manufacturer packs differently, so trust the packing list over the brochure.

White metal garage with cars parked in three open bays

What does a kit almost never cover?

The foundation is the largest gap. A slab of concrete, a set of footings or a gravel pad has to be designed, leveled and finished before anchoring starts, and none of that is covered by the kit price. Site work is billed apart as well: clearing, drainage, grading and the driveway. Permits are yours to obtain, together with any fees the county charges. Putting the building together is also on you, unless the package you bought includes installation. Beyond that lies everything that turns a shell into usable space: liner panels or drywall, interior framing, HVAC, plumbing, wiring and the electrical service, insulation with a vapor barrier, gutters and downspouts, and often the doors too, both walk and overhead. A true kit also leaves you to arrange the helpers, the ladders and whatever rental equipment lifts the trusses into place. Every one of those items is a real line in what the project costs.

Steel frame of a metal building going up, with a lift on site

How is a building we manufacture and install different from a kit?

What we offer is an erected shell, not a pallet of parts. At the Farmville, North Carolina plant, raw coil is run through the roll-former to make our 29-gauge panels. Once the building is delivered, our crew erects the framing and attaches the panels, trim and whatever doors you ordered, working on the site you have prepared, so no separate contractor is needed for the shell. Delivery and installation carry no charge when your site is within 100 miles of an ECOP lot, which is a cost most kit sellers leave you to work out on your own. If the county requires certified engineered drawings, we provide them, and before you buy we tell you whether your site calls for them. The buyer still covers the same things a kit buyer does: foundation, site preparation, permits, and every interior finishing job, from wiring and plumbing to insulation and drywall. Qualifying buildings can also be had on rent-to-own, and no credit check is required.

Tan metal garage with lean-tos on both sides

Which extras are worth pricing now instead of later?

Some items cost little when they are designed into a building and a great deal when they are added afterward. These belong on the first quote: a taller leg for a lift or a loft, a wider or higher roll-up door if an RV or other equipment has to fit, extra walk doors and windows, wainscot panels, a lean-to to cover storage, and framing upgraded to 12-gauge. The lot that prepares your quote can tell you which of them suit your building. Your choice of gable-end and side closures decides whether the building is open or enclosed, and how completely. Framed openings for windows you might add later, and vented ridge caps, are simple at the outset and awkward afterward. The colors for roof, walls and trim cannot change once the panels are rolled. How you plan to use the building shapes leg height and door layout more than any other factor, so say whether you intend to insulate it or finish it as living space when you ask for the quote.

White metal building with a new concrete apron

Which questions put a kit quote and an installed quote on equal terms?

Lay the two quotes side by side and put the same questions to each seller. Is installation labor included, and over what sort of foundation? Do doors and windows come with the price, or are they options? Will engineered drawings be supplied, and does the county I am building in demand them? Find out the framing gauge and the panel gauge. Learn how delivery is billed and how far it reaches. Ask the size of the deposit and the date the balance falls due. Ask what must be in place at the site before the truck arrives, how long the wait is from order to installation, and who applies for the permit. Get every answer in writing. Then add your own estimates for the foundation, the site work and the interior trades to both quotes. At that point you have two finished shells to compare.

White metal building with three overhead doors and a timber-framed entry

Why two metal buildings of the same size can be priced so differently

Two buildings with the same floor area can end up with very different prices, and the cause is often where they will stand. Wind comes first. The design rating for your county governs how the frame is built and anchored, and whether the inspector will ask for certified drawings; the rating climbs the nearer you get to the coast. Ground comes second. Level land that drains well needs little preparation, whereas a low spot might need fill, regrading or a raised pad.

Then come the decisions that are yours: the roof style, how tall the legs are, how many doors you want and how large, insulation, and whether to pour a concrete slab. Doors and height push the price up faster than extra floor area does. Steel prices also shift through the year, so we work from today’s costs instead of printing a chart that would be stale by next month.

Have three facts ready before you ask for a price: where the building will stand, its rough size, and what it will hold. With those, a real number comes back quickly.

Tan three-door metal garage at the end of a concrete driveway

Building in Eastern North Carolina: wind, water and the ground

Few stretches of the East Coast see as much tropical weather as Eastern North Carolina. Floyd (1999), Isabel (2003), Irene (2011), Matthew (2016), Florence (2018) and Dorian (2019) are all still fresh in people’s memory. A few arrived mostly as wind, but most arrived as water. What people learned is that a building stands or falls on how it is anchored and what it sits on.

So our first question is about your site, and colors come later. Wind ratings climb on the way from I-95 to the coast. Flood zones run along rivers and sounds alike, and the county you build in sets the certification its inspector expects. Give us the location and we will price the frame, the anchoring and the drawings that suit it.

Specifications

  • Panels: 29-gauge, roll-formed from coil at Farmville, NC
  • Framing: Galvanized; 14-gauge standard, 12-gauge available
  • Widths: 12′ to 60′ clear-span
  • Leg heights: 9′ to 12′
  • Delivery and install: Included free within 100 miles of any ECOP lot
  • Not included: Foundation, site prep, permits, interior trades
  • Quote turnaround: Current steel pricing, usually within 24 hours

Common Questions

Do I have to hire a contractor to put up one of your buildings?

Not for the shell itself, since our crew erects the steel structure we make and deliver. You would still bring in a concrete contractor to build the foundation, plus an electrician, a plumber and drywall or insulation crews if you finish the interior.

Does the quoted price include roll-up doors?

The quote lists doors and windows as part of the building’s design. Before you order, make sure the written quote shows how many there are, how big each one is and where it goes, because the openings are framed in as the building is made.

What does the site need before the delivery truck arrives?

It should be level and reachable, with nothing in the way of the truck and crew, and with a cured foundation or a finished pad. Because the requirements depend on how big the building is and how it is anchored, ask the lot what applies to yours.

Can I just buy the steel and put it up myself?

What we sell is a building that arrives installed, not a kit, and delivery plus installation cost nothing inside 100 miles of one of our lots. If something specific makes you want to install it yourself, take that up with a lot.

How quickly do quotes come back?

Quotes are priced from current steel costs and normally return in 24 hours or less. If you would rather walk in, lots are open Monday to Friday from 9am until 5pm and Saturday from 9am until 1pm. Or start in the 3D builder and design the building yourself.

A real price within 24 hours

Let us know how big the building should be, which county it is going in and what it will hold. We price from today’s steel costs, there is no obligation, and if a different size would work better for you, we will tell you.