A kit is steel only
The box holds drawings, fasteners, trim, panels and framing. Anything beyond that is bought or hired on its own.
You are holding two quotes for a building of the same size, and the numbers look nothing alike. Before you choose between them, work out what’s included in a metal building kit vs what you buy separately. One quote may amount to a stack of steel parts on a pallet, while the other describes a completed shell already on your property. The sections below cover the contents of a typical kit, what it leaves out, how a building the seller makes, hauls and erects changes the comparison, which extras belong on the first quote, and the questions to put to each seller before you sign.
In short: a kit normally brings assembly drawings, fasteners, trim, wall and roof panels and the galvanized framing, and that is about all. The foundation, site preparation, permits, insulation, electrical work, plumbing, interior walls and the labor to put it up are almost never part of the price. Our building is not a kit. We manufacture the shell, deliver it and install it, and finishing the interior stays with the buyer.
Call (252) 414-5105
Get a Free Quote
Think of a kit as structure plus skin. The structure is galvanized steel framing: legs, trusses or rafters, base rails, hat channel or purlins, and bracing, all pre-punched and cut to suit the size you ordered. The skin is roof and wall panels of 29-gauge steel cut to length, a ridge cap, and trim at the eaves, gables, corners and base in the colors you picked. Fastening comes from bolts at the frame connections, self-drilling screws fitted with sealing washers, and closures, either strip or foam, at the eave and ridge. Most kits ship with assembly drawings. If you ordered them, you also get engineered drawings certified for snow and wind loads. Some kits list roll-up doors and walk doors as separate items, but plenty leave them out until you add them. Each manufacturer packs differently, so trust the packing list over the brochure.
The foundation is the largest gap. A slab of concrete, a set of footings or a gravel pad has to be designed, leveled and finished before anchoring starts, and none of that is covered by the kit price. Site work is billed apart as well: clearing, drainage, grading and the driveway. Permits are yours to obtain, together with any fees the county charges. Putting the building together is also on you, unless the package you bought includes installation. Beyond that lies everything that turns a shell into usable space: liner panels or drywall, interior framing, HVAC, plumbing, wiring and the electrical service, insulation with a vapor barrier, gutters and downspouts, and often the doors too, both walk and overhead. A true kit also leaves you to arrange the helpers, the ladders and whatever rental equipment lifts the trusses into place. Every one of those items is a real line in what the project costs.
What we offer is an erected shell, not a pallet of parts. At the Farmville, North Carolina plant, raw coil is run through the roll-former to make our 29-gauge panels. Once the building is delivered, our crew erects the framing and attaches the panels, trim and whatever doors you ordered, working on the site you have prepared, so no separate contractor is needed for the shell. Delivery and installation carry no charge when your site is within 100 miles of an ECOP lot, which is a cost most kit sellers leave you to work out on your own. If the county requires certified engineered drawings, we provide them, and before you buy we tell you whether your site calls for them. The buyer still covers the same things a kit buyer does: foundation, site preparation, permits, and every interior finishing job, from wiring and plumbing to insulation and drywall. Qualifying buildings can also be had on rent-to-own, and no credit check is required.
Some items cost little when they are designed into a building and a great deal when they are added afterward. These belong on the first quote: a taller leg for a lift or a loft, a wider or higher roll-up door if an RV or other equipment has to fit, extra walk doors and windows, wainscot panels, a lean-to to cover storage, and framing upgraded to 12-gauge. The lot that prepares your quote can tell you which of them suit your building. Your choice of gable-end and side closures decides whether the building is open or enclosed, and how completely. Framed openings for windows you might add later, and vented ridge caps, are simple at the outset and awkward afterward. The colors for roof, walls and trim cannot change once the panels are rolled. How you plan to use the building shapes leg height and door layout more than any other factor, so say whether you intend to insulate it or finish it as living space when you ask for the quote.
Lay the two quotes side by side and put the same questions to each seller. Is installation labor included, and over what sort of foundation? Do doors and windows come with the price, or are they options? Will engineered drawings be supplied, and does the county I am building in demand them? Find out the framing gauge and the panel gauge. Learn how delivery is billed and how far it reaches. Ask the size of the deposit and the date the balance falls due. Ask what must be in place at the site before the truck arrives, how long the wait is from order to installation, and who applies for the permit. Get every answer in writing. Then add your own estimates for the foundation, the site work and the interior trades to both quotes. At that point you have two finished shells to compare.
Two buildings with the same floor area can end up with very different prices, and the cause is often where they will stand. Wind comes first. The design rating for your county governs how the frame is built and anchored, and whether the inspector will ask for certified drawings; the rating climbs the nearer you get to the coast. Ground comes second. Level land that drains well needs little preparation, whereas a low spot might need fill, regrading or a raised pad.
Then come the decisions that are yours: the roof style, how tall the legs are, how many doors you want and how large, insulation, and whether to pour a concrete slab. Doors and height push the price up faster than extra floor area does. Steel prices also shift through the year, so we work from today’s costs instead of printing a chart that would be stale by next month.
Have three facts ready before you ask for a price: where the building will stand, its rough size, and what it will hold. With those, a real number comes back quickly.
Few stretches of the East Coast see as much tropical weather as Eastern North Carolina. Floyd (1999), Isabel (2003), Irene (2011), Matthew (2016), Florence (2018) and Dorian (2019) are all still fresh in people’s memory. A few arrived mostly as wind, but most arrived as water. What people learned is that a building stands or falls on how it is anchored and what it sits on.
So our first question is about your site, and colors come later. Wind ratings climb on the way from I-95 to the coast. Flood zones run along rivers and sounds alike, and the county you build in sets the certification its inspector expects. Give us the location and we will price the frame, the anchoring and the drawings that suit it.
Not for the shell itself, since our crew erects the steel structure we make and deliver. You would still bring in a concrete contractor to build the foundation, plus an electrician, a plumber and drywall or insulation crews if you finish the interior.
The quote lists doors and windows as part of the building’s design. Before you order, make sure the written quote shows how many there are, how big each one is and where it goes, because the openings are framed in as the building is made.
It should be level and reachable, with nothing in the way of the truck and crew, and with a cured foundation or a finished pad. Because the requirements depend on how big the building is and how it is anchored, ask the lot what applies to yours.
What we sell is a building that arrives installed, not a kit, and delivery plus installation cost nothing inside 100 miles of one of our lots. If something specific makes you want to install it yourself, take that up with a lot.
Quotes are priced from current steel costs and normally return in 24 hours or less. If you would rather walk in, lots are open Monday to Friday from 9am until 5pm and Saturday from 9am until 1pm. Or start in the 3D builder and design the building yourself.
Let us know how big the building should be, which county it is going in and what it will hold. We price from today’s steel costs, there is no obligation, and if a different size would work better for you, we will tell you.