No builder needed
We build and install the steel building, so no separate contractor is needed.
If you have something to protect from Grand Strand humidity and salt air, the first decision is how the building should arrive. Metal building kits in Myrtle Beach, SC come two ways: plant-direct kits that you put up yourself, or a turnkey package that we erect on your Horry County pad. Either way the steel is 29-gauge, roll-formed at our Farmville plant. Our walk-in lot at 1046 Greenville Blvd SW in Greenville lets you pace out a footprint before the building is hauled to Myrtle Beach. With the turnkey package, ECOP builds and installs the building, so no one else needs hiring for the steel. Delivery and setup cost nothing within 100 miles across Eastern NC, Eastern SC and Eastern VA. We do not post dollar figures online, so a price comes by phone at (252) 414-5105 or through the quote form.
Call (252) 414-5105
Get a Free Quote
A kit can be bought as materials only, or as a full ECOP supply-and-erect job. Choose the turnkey route and you do not need a separate builder for the steel building, since building it and installing it are both our work. Call (252) 414-5105.
Each kit package comes with panels, framing and hardware. If you would like us on the job, we can erect it at your Grand Strand site. And when Horry County or your insurance company calls for certification, we can supply a certified package.
All manufacturing and roll-forming happens in Farmville, none of it in Greenville. Greenville is where you can walk in, and it is also our listed address: East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834. Look at a sample there on Greenville Blvd SW first, and then we deliver to Myrtle Beach. You can reach us at (252) 414-5105.
We regularly deliver to Conway, North Myrtle Beach, Surfside Beach, Murrells Inlet and Georgetown, along with other Eastern SC towns inside the free-delivery range. Ask about kits, about inventory that is for sale, and about rent-to-own, which carries no credit check on qualifying buildings.
The saving on a kit is paid for in labor, so count your hours, your helpers and your tools before you count the dollars. Then look hard at the ground the frame will stand on. Keeping a steel frame square and level is difficult on sandy or soft ground and on a slope, and it is the point where most do-it-yourself jobs come apart. Once the frame is off square, every panel you hang after it has to be coaxed into place.
Anchors are chosen by two facts: what the building stands on, whether concrete, asphalt or soil, and the wind rating your county requires. Along the coast, expect the inspector to hold the finished building up against the certified drawings, anchors and all.
If that is more than you want to tackle, ask us to install the building. Installation removes the risk, and your weekend is for using the building, not building it.
Where the ground is sandy, it drains well, which helps, but the anchors have to be matched to it, so say what your soil is like when you request a quote. Plenty of parcels also fall inside mapped flood zones, so pad height, anchoring and certification belong at the top of the list, ahead of paint colors and door sizes.
Design wind speeds along this coast are among the highest in the region, and building departments expect certified drawings, so ask us for them at the outset. Hugo, in 1989, is the storm others are still measured against. Matthew and Florence added a lesson about water: the Waccamaw went on rising for days after Florence had passed through.
Day to day, the damage comes from salt air, which is a fact of life for anything metal in Myrtle Beach, the heart of the Grand Strand. Rinse the panels, touch up the trim and fasteners, and pick a roof style that sheds debris, and a steel building will look right for decades.
ECOP sells them. The steel is manufactured in Farmville, we keep sales lots in Greenville, and we deliver and install in Myrtle Beach and across Horry County. Call (252) 414-5105.
Not on a turnkey package. We build and install the steel building ourselves, from manufacturing through delivery and setup, so there is no separate contractor to hire for it.
No. The plant is in Farmville, where the panels are roll-formed. Greenville is a walk-in lot only.
The price depends on the size, the height, the doors and whether the site needs certification. We do not post dollar figures online, so call (252) 414-5105 or use the quote form.
Yes, for qualifying buildings. Ask when you call or when you send in the quote form.
Tell us how big the building should be, which county it will stand in and what it will hold. The quote is worked out from what steel costs right now, it carries no obligation, and if a different size would suit your use better we will tell you.