Built and installed by us
Making the building and putting it up are both our work. Nobody else has to be hired for the steel.
If you are comparing metal building prices in Beaufort, NC, on the Crystal Coast in Carteret County (not Beaufort, SC), start with what you can check for yourself. We form the panels at our plant in Farmville. The Greenville lot is a place to walk in and look at samples, and nothing is manufactured there.
A quote from us is built on the coil, framing and installation your own site needs, never on a national price list. We also put the building up, so there is no separate builder to hire. Any dollar figure posted here would be invented, so we post none. Call (252) 414-5105 and we will work out a real quote.
Call (252) 414-5105
Get a Free Quote
For a metal building in Beaufort, one company manufactures it, brings it to your site and puts it up, and that company is us. The steel never goes to a second builder or contractor. Questions about your Beaufort job go to (252) 414-5105.
The Beaufort we mean is in North Carolina, in Carteret County on the Crystal Coast, not the town of the same name in South Carolina. Prices here take in coastal wind, the damp air near Front Street and the waterfront, and lots that lie toward Newport, Harkers Island, Atlantic Beach and Morehead City. Charts built for inland kits leave out framing choices that matter near salt water and during hurricane season. We quote straight from the Farmville plant, and the Greenville lot is only where you go to see samples. We serve those towns routinely.
Start with width and length; a clear span can reach 60′. Leg height is next, since taller walls and RV clearance take more framing. Then comes the roof, which can be regular, A-frame with a boxed eave, or vertical panels, which shed water. Doors and openings count too: roll-ups, walk-ins and framed bays. Certification follows, meaning engineered drawings when Carteret County asks for them. Last is delivery and installation, and most sites in Eastern NC within 100 miles pay nothing for either.
On the Crystal Coast the price also reflects wind certification where Carteret County asks for it, roof styles chosen for driving rain and salt spray, boat and RV clearances, and door packages sized for marine or shop equipment. That is why a Beaufort, NC quote cannot be read off a Beaufort, SC chart. No dollar amount is posted here, because it would be invented. Phone (252) 414-5105 with your footprint and we will quote it.
Roll-forming happens at the Farmville plant. The Greenville lot is for walk-ins, and it is the place to look over framing samples when that would help you decide. You can phone (252) 414-5105 first, or go straight to East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834. When the quote is settled, we schedule delivery to Beaufort and the towns around it.
Why would two buildings of identical size get quotes that are far apart? Usually because of where they stand. The first reason is wind. Each county has its own design wind speed, which decides how the building is framed and anchored and whether the county wants certified drawings, and the figure rises as you approach the coast. The second reason is the site. Level land that drains well takes little work to prepare, but a low lot can call for fill, regrading or a raised pad.
Past those two, the remaining choices are yours: the roof style, the leg height, how many doors you want and how big they are, any insulation, and whether to add a concrete slab. Doors and wall height raise a price faster than extra floor area does. Steel also changes in price during the year, so each quote is worked out from what steel costs now; a printed chart would be wrong within a month.
Three things speed this up: the address, a rough size, and what you plan to keep inside. Send those and a real number follows quickly.
Begin with the lot and where rain will go. Most people in Beaufort judge a storm against Florence in 2018, which soaked the area for days and sent surge water into neighborhoods that had stayed dry before. If your lot sits inside a mapped flood zone, then pad height and anchoring deserve as much attention as the building. Low ground may need fill or regrading before anything is set on it.
Beaufort is among the state’s oldest towns and has faced coastal storms ever since the early 1700s, but salt water still affects how a steel building has to be specified. The closer a site is to the coast, the higher the design wind speed, so certification, anchoring and framing requirements that an inland lot could skip often apply here. Request certified drawings at the outset: the Carteret County inspections office expects them, and an insurer may ask for them too. Close to the water, a CAMA permit may be needed in addition to the county’s own.
Salt air does its damage gradually. Rinse the panels twice a year, touch up fasteners and trim when they need it, and the building should outlast most of what is kept inside it.
That depends on the size and height, the roof style, the doors, whether certification is needed, and what delivery and installation involve at your Carteret County site. Give us your footprint at (252) 414-5105 and we will quote from there.
No. We manufacture the building, deliver it and set it up, so the steel needs no other contractor. Call (252) 414-5105.
At our plant in Farmville, NC. The Greenville lot is for walk-in visits only; the roll-forming line is not there.
Width and length, leg height, whether the roof is vertical or regular, the door package, and whether the county requires certified drawings. Most sites near Beaufort fall inside the 100 miles where delivery costs nothing.
Yes. Phone (252) 414-5105. Deliveries from the Farmville plant routinely go to Harkers Island, Newport, Atlantic Beach and Morehead City.
We mean Beaufort, North Carolina, a Crystal Coast town in Carteret County not far from Atlantic Beach and Morehead City. The Beaufort in South Carolina is a different place. Our number is (252) 414-5105.
Tell us how big the building should be, which county it will sit in, and what it will hold. The price comes from current steel costs and carries no obligation. If a different size would suit you better, you will hear that from us.