Build and install included
The building and the installation both come from us, so the steel needs no second contractor.
A common mistake when looking at metal building prices in Greenville, NC is to hunt for a figure on a national price list, when what you need is a price for your own site. The site in Pitt County, the roof style and the doors all change the number, so we build each quote from the actual coil, framing and installation involved. We do not publish dollar amounts. Coil becomes panels on our roll-forming line in Farmville, and the walk-in sales lot is at 1046 Greenville Blvd SW. We build and install the building ourselves, which means no separate builder has to be hired. For a real quote, call (252) 414-5105.
Call (252) 414-5105
Get a Free Quote
From manufacturing through delivery to installation at your Greenville, NC site, the work is ours, so the steel building needs no separate builder or contractor. Call (252) 414-5105 if you want to talk it through.
This is Greenville in Pitt County, North Carolina, not the Greenville in South Carolina. Pitt County permits, the humid Eastern NC climate and the distance from your parcel to the Greenville Blvd SW lot all feed into what a building costs here. The panels come from the Farmville plant, and the Greenville lot is for sales only. We regularly serve the towns around it: Farmville, Winterville, Bethel and Ayden.
Six things set the price of a metal building in Greenville, and the first two are about shape. Width and length lead, with clear spans available up to 60′. Next comes leg height: taller walls, and the headroom an RV needs, call for more framing.
The other four are about detail. The roof can be regular, the A-frame boxed eave style, or vertical, with panels that let water run off. Doors and openings come as roll-up, walk-in or framed bays. Certification means engineered drawings, which Pitt County may ask for, and its inspectors may ask for certified drawings when a building sits on a permanent foundation. Last is delivery and installation, which cost nothing at most sites in Eastern NC within 100 miles.
Door packages and roof styles can be compared in person at our Greenville lot before you commit to a configuration, which is worth doing because those choices change the quote. You will not find an invented dollar figure here. For a real number on your footprint, call (252) 414-5105.
Panel production happens at the Farmville plant. Greenville is where visitors come to see displays, at East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834. Look over the framing samples if that helps, then call (252) 414-5105 to arrange delivery to Bethel, Ayden, Winterville, Farmville or Greenville.
Why would two buildings of identical size come back with quotes far apart? Usually because of where each one will stand. A county’s design load governs the framing and anchoring, and with them whether you will need certified drawings. Then there is the ground: flat land that drains well asks for little preparation, while a site that sits low or slopes could require fill, regrading or a raised pad.
The rest is up to you: roof style, leg height, how many doors and how wide, insulation and an optional concrete slab. Doors and wall height usually weigh more in a quote than the number of square feet. Steel itself changes in price during the year, so any chart we published would soon be stale, and we quote from current figures instead. Come to the call with your address, rough dimensions and a note of what will go inside, and the number arrives fast.
Greenville grew up beside the Tar River, and anyone who lived here in 1999 remembers Hurricane Floyd, when the river spread well beyond its banks. Matthew in 2016 was much the same story inland: both storms arrived mostly as rain, and the Tar and the Neuse took days to return to their banks. Wind matters too, but for a building the practical questions are about water: how the lot drains, whether the pad sheds rain, and whether the anchors suit the soil.
The ground has its own lesson. Around Greenville a layer of sandy loam lies over clay on level land, and the water table is shallower than most newcomers assume. That is good news for sweet potatoes and tobacco and bad news for a slab laid in the lowest part of a lot. Look at the site right after a heavy summer storm and keep the pad out of the dips. Where a creek or the river runs near the lot, open the county flood map before fixing the building’s position. Five minutes with it can head off a headache with your insurer.
It depends on width and length, height, roof style, doors, whether certified drawings are required, and what delivery and installation involve at your Pitt County site. Call (252) 414-5105 with your dimensions and we will price that exact building.
No. The same company manufactures the building, brings it to your site and sets it up, so there is no builder to hire for the steel. Call (252) 414-5105.
Only the sales lot. The roll-forming happens at the Farmville, NC plant, and Greenville is where customers walk in.
Width and length, leg height, whether the roof is vertical or regular, the door packages, and a Pitt County requirement for certified drawings. Delivery rarely changes the number, because most sites near Greenville lie within the 100 miles where delivery is free.
Yes. Call (252) 414-5105. Bethel, Farmville, Ayden and Winterville are all places we deliver to on a regular basis.
It is Greenville, North Carolina, in Pitt County. Our lot is at 1046 Greenville Blvd SW, and the number to call is (252) 414-5105.
Send the building size, the county it is going in and what it will store. We work from today’s steel prices and attach no obligation, and we will say so if another size would suit you better.