We build it ourselves
ECOP puts up the steel building as well as making it, so you hire no other contractor.
A common mistake with metal building prices in Rocky Mount, NC is hunting for a chart. A list written for the whole country cannot know your parcel in Nash or Edgecombe County, or how many doors you need. So we price each building from the coil, the framing and the installation it truly takes, and we print no dollar amounts we would have to make up.
Our Farmville plant roll-forms the steel, Greenville is where you can walk the display lot, and ECOP builds and installs the building, so the steel needs no separate builder. For a real quote, call (252) 414-5105.
Call (252) 414-5105
Get a Free Quote
We manufacture your metal building, bring it to your Rocky Mount site and install it. The steel building itself needs no outside builder or contractor, so a single call to (252) 414-5105 starts the process.
Rocky Mount straddles the border between Nash and Edgecombe counties, so the county that inspects your parcel can change the price. Where setbacks from the Tar River floodplain apply, they count too, and so do the shop needs of the I-95 and US 64 corridor. We quote direct from the Farmville plant to Rocky Mount and to nearby Tarboro, Nashville, NC, Battleboro and Sharpsburg, which we serve regularly.
Start with the footprint: width and length, with clear spans up to 60′. Next is leg height, because taller walls and RV clearance call for more framing. The roof is third, and it can be regular, A-frame with boxed eaves, or vertical panels that carry water off. Fourth are the openings, which range from roll-up and walk-in doors to framed bays. Fifth is certification: engineered drawings are required whenever the county asks for them. Sixth is delivery and installation, at no charge for most sites across Eastern NC inside 100 miles.
In Rocky Mount, two-county permit rules, truck-bay door packages along I-95 and the need for certified drawings are what separate one quote from another, and a one-size kit price misses all of them. We will not invent a dollar figure here; phone (252) 414-5105 with your footprint for a real quote.
Our Farmville plant makes the steel. If it helps to see framing first, walk the display at the Greenville lot, 1046 Greenville Blvd SW, and we will then set a delivery date for Tarboro, Nashville, NC, Battleboro, Sharpsburg or Rocky Mount. Phone (252) 414-5105 to reach us.
Same-size buildings do not cost the same everywhere, and the reason is usually the site. Your county sets a design load, and that decides how the building is framed and anchored and whether certified drawings must come with it. Then there is the lot. Level, well-drained ground asks for hardly any preparation, but a low or sloping parcel can need fill, grading or a taller pad before anything is erected.
On top of that come the options you pick: the roof style, how tall the walls are, how many doors there are and how wide, insulation, and a concrete slab if you want one. Each extra door or foot of wall raises the bill faster than added floor area. Steel also changes in price during the year, so a printed chart would be wrong within a month, which is why we work from current prices.
For a quick, real number, send us the address of the site, its approximate dimensions and what you plan to keep inside.
Begin with what is under the pad. Rocky Mount sits at the falls of the Tar River, and its ground behaves like the rest of the inner coastal plain: flat, sandy loam laid over clay, with groundwater shallower than newcomers tend to assume. Crops such as sweet potatoes and tobacco do well on it, but a slab in a low corner of a lot tends to suffer. So watch your own parcel after a hard thunderstorm in summer, mark where water lingers and plan the building for a drier part of the lot.
Storms add to the case. When Floyd came in 1999 and Matthew followed in 2016, each reached this far inland as rain, and the Tar and the Neuse spent days outside their banks. Gusts matter, but for most lots in Nash and Edgecombe counties the questions that count are drainage, a pad shaped to run water off and anchors suited to the soil. If a creek or the river is close to your lot, consult your county’s flood map before you fix the location.
Each price starts from the size, wall height, roof style, doors, certification, and delivery and installation that your site in Nash or Edgecombe County needs. Phone (252) 414-5105 with your footprint for a real quote.
No. We make the building, deliver it and put it up, which leaves nothing for an outside contractor to do on the steel. Phone (252) 414-5105 to talk it over.
No. Panels are roll-formed at ECOP’s Farmville, NC plant. Greenville has a lot for sales visits only, with no roll-forming line.
Width, length and leg height lead the list, followed by the roof style, the door package and whether the county requires certified drawings. Delivery costs nothing within 100 miles, a range that takes in most of the area around Rocky Mount.
Yes. Phone (252) 414-5105. Buildings go out from the Farmville plant to Tarboro, Nashville, NC, Battleboro and Sharpsburg on a regular basis.
Send us the size you have in mind, the county the lot is in and what you plan to keep inside. The figure we return is based on today’s steel prices, carries no obligation, and comes with a note if another size would fit your needs better.