Metal Building Quote

White metal garage with cars parked in three open bays

24-Hour Turnaround

Across Eastern North Carolina, old wooden tobacco barns still lean in the fields, and steel has taken over their work. To find out what a steel building would cost on your own land, ask for our metal building quote. You will have it within 24 hours, with the price based on what steel coil costs today and delivery and installation included within 100 miles. Tell us how large the building should be, the county it will go in and what it will hold. If another size would suit you better, we will say so.

Call (252) 414-5105

Get a Free Quote
time fast 2_1

Back in 24 hours

You get a figure you can use, not a call back meant to screen you.

delivery truck

Delivery and setup included

Included for any site within 100 miles of one of our 28 lots.

Diverse Product Range

Itemized pricing

Each line is listed, so quotes from different sellers can be compared fairly.

money_1

Today’s steel prices

Based on the coil market now and good only for a set period.

Diverse Product Range

Size advice

If a different size would fit better, we will tell you.

Diverse Product Range

No obligation

Asking costs nothing: no deposit and no pressure.

White metal building with a new concrete apron

What to tell us when you ask

If you know the width, the length and the leg height, include them; if not, tell us what you plan to keep inside and we will suggest sizes. Give us the county too, because certification rules and wind or snow loads change from one county to the next. Mention the roof style you prefer, how many doors and windows you want and roughly where they go, and whether the ground is level and how a truck will reach it. That last detail affects the installation more than most people expect.

White metal garage with black trim and two roll-up doors

What a metal building quote covers, and what it leaves out

The price covers the building, delivery and installation for any site within 100 miles of one of our 28 lots, anchoring sized for your ground, and certified drawings if your county requires them. Interior finish, utilities, concrete and grading are not included. We list each item separately so every charge is easy to read, and so you can set our figure beside someone else’s on equal terms instead of choosing by one headline number.

Four-bay metal garage with the doors open

Sizing mistakes we catch before you order

On quote calls, the thing we correct most often is leg height. People pick a height that suits what they store today, and within two years many are sorry they did, because once the building is up, leg height cannot be altered at all. Next comes width against length. Extra length costs a good deal less than extra width, so when you need more floor area we will usually suggest making the building longer.

White metal building with three overhead doors and a timber-framed entry

Why two metal building quotes of the same size can differ

Quotes for two buildings of the same size can land far apart, and the reasons are usually local. Wind comes first. Each county has a design wind speed, and that figure drives how the building is framed and anchored and whether certified drawings are needed at all. It gets higher the closer you are to the coast.

The rest comes down to choices that are yours: the roof style and the leg height, the number and size of the doors, and whether to insulate or pour a concrete slab. Pricing climbs faster with doors and height than it does with floor area. Steel itself moves in price through the year, so we quote from current figures instead of posting a chart that would be stale in a month.

Before you ask for a price, work out the location, the rough dimensions and the contents. With those answers in hand, a real number comes back fast.

Tan three-door metal garage at the end of a concrete driveway

Building in Eastern North Carolina: the ground first, then the size

Settle the ground first, because it shapes the job before the building arrives. Level land that drains well takes little preparation. A low lot can call for fill, grading or a raised pad, and grading is not part of our quote. When you ask for a price, tell us whether the site is level and how a truck would reach it.

Then think about size. Wooden tobacco barns still lean in the fields all the way from Wilson to the coast. They were built tall and narrow to suit curing leaf, and for a century they were the usual outbuilding across Eastern North Carolina. Steel does that job now, on farms and behind houses alike, with wide floors free of interior posts under roofs that shed summer thunderstorms.

What goes inside has changed more than the need for cover has. One footprint might shelter a camper, a side-by-side that comes out each deer season, a boat for the Pamlico, or equipment for sweet potatoes or peanuts. To pick a size, take the longest item you own, allow room to walk around it, and put one more bay on top. The mistake we hear about most is building too small.

Common Questions

What is the quickest way to get a metal building quote?

Send the size, the county and what you intend to use the building for through the quote form, or phone (252) 414-5105. Most quotes return within 24 hours, itemized, and that price already covers delivery and installation for sites within 100 miles.

Does a metal building quote cost anything?

No. A quote is free, takes no deposit and obliges you to nothing. We would sooner give an honest number and lose the job than talk you into the wrong size.

Which items does a metal building quote leave out?

Interior finish, utilities, concrete and site grading are the four items left out. What we do quote is the structure, the delivery, the anchoring, the installation and certified drawings where they are required, and the exclusions are printed on the quote instead of being buried in it.

Why do you ask which county the building is going in?

Certification requirements and design loads for wind and snow vary from county to county in NC, SC, VA and GA. Near the coast, wind ratings are enforced that inland counties ignore, and in the mountains snow load is added. A number given without knowing where the building will stand may not hold up when the plans are reviewed.

How long can I count on the price in a quote?

For a stated period, because our prices follow the steel coil market. We tell you how long when we hand you the number, and should your project be delayed, we will update the price without any argument.

Your quote, 24 hours from asking

Three details are enough: how big, which county and what you will keep inside. From those we work out a price on current steel costs. Asking puts you under no obligation, and you will also hear from us if a different size makes more sense.

Request a Quote Design It in 3D