Metal Buildings Delivery

Tan and brown metal garage with two roll-up doors

Delivery · Logistics

Three things about metal buildings delivery from ECOP are easy to check for yourself: the lot, which you can visit at 1046 Greenville Blvd SW in Greenville; the plant in Farmville, where the buildings are made; and the delivery date we give you when you place the order. A building leaves Farmville on our schedule, stops at the Greenville lots when it needs staging, and is installed on your pad rather than dropped for someone else to piece together. The steel needs no separate builder. Call (252) 414-5105.

Call (252) 414-5105

Get a Free Quote
Reputation and Trust

No second contractor

One company makes, delivers and installs the steel building.

Support

Call to schedule

(252) 414-5105

Locations

Greenville lots

You can find us at 1046 Greenville Blvd SW, Greenville, NC 27834.

power 2

Built in Farmville

Our plant is in Farmville, NC, not Greenville.

delivery truck

Free delivery area

Within 100 miles of the Greenville lots.

Relocated

Setup included

Qualifying jobs include both delivery and setup.

delivery truck

Where we deliver

The Eastern NC, SC and VA corridor.

Steel frame of a metal building going up, with a lift on site

Delivery and installation from one company

One company makes the building, hauls it to your site and puts it up. For the steel itself, no separate builder or contractor has to be found or scheduled. If you have a question about how that works, call (252) 414-5105.

White metal building with open bays, with a truck and equipment trailer nearby

What metal buildings delivery covers on the coastal plain

Free delivery and setup go with most qualifying jobs within 100 miles of an ECOP lot. The crew will need a clear way in, room overhead and a site that is ready for the building. Ground that is soft, trees that hang low and gates that are tight all slow a truck down, so mention them early and we can plan for the equipment the job needs.

ECOPM53

How long it takes

Because our panels are formed in Farmville, we are not left waiting for a faraway distributor to supply them, and standard configurations move faster than steel that has been brokered. Certified drawings, unusual colors or elaborate door packages all take extra time. We give you an actual date when you order, not a sales line.

White metal building with a new concrete apron

Scheduling a delivery

Phone (252) 414-5105 with your zip code, a note on how ready the pad is and anything we should know about access. The lot is at East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834.

Gray metal garage with two open doors and a lean-to under trees

Decisions to make before your metal building is delivered

Size and color get most of the attention at first, yet the choices that decide how you feel about the building ten years on are made before either. The first of them is the site: look for ground that sits high, drains well and still lets a truck reach it, and measure how far the building must stand from your property lines, your well and your septic field.

After the site comes a list. Write down everything the building will house for the next five years, including purchases you have not made yet. The length and width come out of that list, and so does the leg height: the tallest item decides it. If leaves, pine needles and rain will land on the roof, a vertical one sheds them best. Put the doors where the driveway runs, not where they would look symmetrical.

Take that list to the lot, or type it into the quote form, and we will reply with a real number. Add the access and pad details and we can plan the delivery as well.

ECOPM28

What to check with the county and on the ground before delivery

Paperwork comes before concrete. Ask the county inspections office what permit and drawings a building your size requires, and whether your parcel falls in a flood zone. If any part of the land is low, look at the county flood map too, since low ground may be a mapped flood zone.

Then the soil. East of I-95 the ground is flat sandy loam over clay, and groundwater is frequently within a few feet of the surface. It is some of the finest farmland in the country: North Carolina leads every other state in sweet potatoes, and most of them are grown in counties like these. That same ground calls for some forethought before a slab goes in.

Stand on the site after a heavy rain and see where water collects. Build the pad up instead of digging down, compact it in layers and slope it so rainwater runs off. Sandy soil needs anchors suited to it. Get those right and a steel building here can stay dry inside for decades.

Specifications

  • Phone: (252) 414-5105
  • Plant: Farmville, NC (not Greenville)
  • Address: East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834
  • Delivery: Free within 100 miles
  • Setup: Included with qualifying delivery
  • Model: Custom + installed

Common Questions

Will I have to find a builder once the building arrives?

No. Delivery is only part of what we do. The same company makes the building and installs it, and no builder is needed for the steel. Call (252) 414-5105.

Are the buildings made at the Greenville lot?

No. Farmville, NC is where they are made. The Greenville lots exist for sales only.

Is delivery of a metal building free?

For most qualifying jobs within 100 miles of an ECOP lot, it is. Call (252) 414-5105 to confirm your site.

Do you just unload the materials and leave?

No. We deliver the steel building and then install it ourselves, which leaves nothing for a builder to do on that part.

What does my site need to be like for a delivery?

It needs a level pad, a way in for the truck, clearance overhead and firm ground. Send photos when you call.

Where does the building come from before it reaches me?

It comes from the plant in Farmville, NC. If you want to see us, the lots are at 1046 Greenville Blvd SW, Greenville, NC 27834 (East Carolina Outdoor Products).

A real number inside 24 hours

Describe what you plan to store, the size you have in mind and the county where the building will go. We price at current steel costs, and the quote commits you to nothing. Should a different size fit your plans better, we will mention it.

Request a Quote Design It in 3D