Widths from 12′ to 60′
Clear-span frames with no posts inside, and legs of 9′ to 12′ for tall equipment.
Most people shopping for metal buildings in Eure, NC pick a size and a color first, and that is the usual mistake. The questions that decide whether you are still pleased with the building ten years on come earlier: where the pad goes, what the county requires and what the building has to hold. Settle those three and the size very nearly chooses itself.
Our Gates County lot stands in Eure beside US 13, a few miles below the Virginia line. Farmers, mechanics and homeowners drive in from Ahoskie, Corapeake and Sunbury, and from across the border near Suffolk, looking for a shop, a garage or a carport. The steel is 29-gauge, roll-formed at our own plant in Farmville, NC, and our own crew puts each building up. From Monday to Friday the lot keeps hours of 9am to 5pm, and on Saturday it keeps 9am to 1pm. Its phone number is (252) 287-9954.
Call (252) 287-9954
Get a Free QuoteAll 28 lots: ecopofnc.com/locations · open Mon–Fri 9am–5pm, Sat 9am–1pm
347 NC 42 W
Ahoskie, NC 27910
(252) 287-9954
Mon–Fri 9am–5pm, Sat 9am–1pm
1330 US 17
Elizabeth City, NC 27909
(252) 331-6869
Mon–Fri 9am–5pm, Sat 9am–1pm
1046 Greenville Blvd SW
Greenville, NC 27834
(252) 414-5105
Mon–Fri 9am–5pm, Sat 9am–1pm
On many Eure properties the shop turns out to be the most useful building: storage for a tractor and a sprayer, room for transmission rebuilding as a sideline, or just cover for a boat. Our widths run from 12 feet up to 60 feet, always clear-span. With nothing standing inside, a 30-by-40 gives you one full open bay, while a 40-by-60 splits into two long bays with space for a lift.
Legs of 9 to 12 feet decide what will pass through the door. Take 12-foot legs if a lifted truck, a combine header or a center-console boat riding on its trailer has to go inside. Windows, walk doors and roll-up doors can go wherever you like. Framing is made of galvanized steel; 14-gauge comes as standard, and 12-gauge can be ordered for wider spans.
You will find the lot at 11 US 13, Eure, NC 27935, and it has its own line, (252) 287-9954. Anyone coming from Ahoskie or Winton can simply drive north on US 13. From Elizabeth City, Gatesville or Sunbury, head west on US 158 until it meets US 13. Suffolk drivers follow US 13 south over the state line. Visiting hours are 9am to 5pm Monday to Friday and 9am to 1pm on Saturday.
Come with a rough footprint in mind, along with the leg height you expect to need and anything that must pass through the door. We put those details into a quote priced from the current cost of steel, so you can settle on a size with a price in front of you. There are 28 ECOP lots across Southwest Virginia, Upstate South Carolina and North Carolina, and the Gates County lot is one of them; every lot is listed with a map at /locations/.
Gates County is a low, flat place where the ground stays damp. The Great Dismal Swamp borders it on the east, and the Chowan River runs along its western side. Two things follow for a building. The first is moisture: the framing is galvanized and the panels are coated at the factory, which lets them cope with the dampness that rots wooden posts and sills when they are untreated. A carport or lean-to with open sides also lets air pass under the roof instead of being trapped.
The second is wind. Hurricane-season wind has to be part of the design, because the coast is not far away. Whether a particular building needs certified drawings turns on how big it is and what the county requires at the time, and requirements vary from county to county and can change. We will tell you before you buy if the site calls for wind-load certification, and where it does, we provide the engineered drawings.
No separate builder is needed. We make the panels, bring the package to your property and send our own crew to put up the shell, which leaves no second contractor to line up for the steel. Because Eure has a lot of its own, we deliver and install free of charge anywhere in Gates County and in the counties next to it on either side of the state line; all of that falls inside our 100 miles.
The site is the part that falls to you: a concrete slab or a level gravel pad, either one reachable by truck. Ground as low as Gates County’s calls for a drainage plan before any concrete or gravel goes in. After the steel arrives, our crew can usually have the shell up within days. Electrical work, plumbing and interior walls are outside what we do, and you can add panel insulation as an option; your own trades handle the rest afterward.
Every quote starts from what steel costs when you ask, and steel prices move, which is why we do not publish prices. Footprint has the biggest effect on the figure. Next come leg height and framing gauge, then whether your site needs wind certification, then the package of doors and windows, and last the roof style.
Grading, drainage work and the pad itself, whether concrete or gravel, are separate from what we supply and are handled on your side, and so is finish-out. For a number, bring rough dimensions to the Gates County lot, or design the shop yourself in our 3D designer and submit it; a written quote usually comes back within 24 hours. On qualifying buildings there is also rent-to-own, with no credit check, so a shop can go up without one large payment up front.
Start with the site. Look for the highest, best-drained ground that you can still drive to, and measure the setbacks from your property lines, your well and your septic field. Next come the rules: ask the inspections office which permit and drawings a building of your size needs, and whether the parcel lies in a flood zone. Last is the use. Make a list of everything the building will have to hold during the next five years, and count what you have yet to buy.
With those three answers in hand, the choices that remain are easy. The list sets the width and length, the tallest item on it sets the leg height, and the amount of debris falling on the roof sets the roof style, since a vertical roof handles rain, leaves and pine needles best. Put the doors where the driveway runs rather than where they look balanced. Hand the list over at the lot, or send it with the quote form, and we will answer with a real number.
The ground comes first here, because it settles most other questions. Eure sits in rural Gates County, with the Chowan River on one side and Merchants Millpond State Park on the other. Water shapes this part of the state: the Pamlico and Albemarle sounds, the Roanoke, Pasquotank, Chowan and Pamlico rivers, and low, flat farmland in between. The soil varies, from sandy ridges to dark organic ground that soaks up water and holds it. That makes the pad worth real attention here. Raise it, pack it down and grade it so water drains away, and it does more for the building than it would in most places we deliver.
Storms here tend to be about water pushed by wind. Isabel (2003) and Irene (2011) each drove water from the sounds well inland, over yards and fields, so find your parcel on the flood map. If you are close to the shoreline, check with the county on whether a CAMA permit is needed, because most counties around the sounds come under North Carolina’s coastal management rules. All that open country has an upside: room. Farms that grow peanuts, cotton and soybeans have counted on steel buildings with wide clear spans for decades.
Come to 11 US 13, Eure, NC 27935. It stands right on the highway, a few miles below the Virginia line. Its own phone number is (252) 287-9954. Hours are 9am to 5pm Monday to Friday and 9am to 1pm on Saturday. Customers come from Chowan, Hertford and Gates counties and from across the border near Suffolk.
Yes. Pick 12-foot legs and a clear-span width wide enough for one open bay, so a two-post lift has no interior post to work around. The slab and the lift, with its wiring, are yours to arrange once we have put up the shell.
Yes. Anything inside 100 miles of one of our lots gets free delivery and installation. Eure is only a few miles away from the state line, which puts Suffolk, Franklin and the neighboring Virginia counties well within reach.
That turns on how big the building is and what Gates County requires at the time; county rules differ, and they change. Whether the drawings must be certified and engineered is something we confirm for your site before you buy, and where they are needed, we supply them.
Either a concrete slab or a level gravel pad will do, and you prepare it. Gates County ground is low and wet, so raise the pad and leave water somewhere to go before our crew arrives.
Usually within 24 hours. Give us the size, the leg height you want and how the doors should be laid out, either at the lot, by phone at (252) 287-9954, or by drawing the building up in the 3D designer. The quote uses the price of steel when you ask.
Give us the rough size, the county and what the building will store. We price from steel as it costs on the day, a quote does not commit you to buying, and if what you describe points to another size, we will suggest it.