Nobody else to hire
The steel building is made, delivered and installed by us; no outside contractor is involved.
Start with what you can see for yourself: for metal buildings in Jacksonville, NC, that means the walk-in sales lots in Greenville and the Farmville plant where the panels are roll-formed. From there we deliver across Onslow County, with setup free inside 100 miles. People use the buildings as shops, as storage and on farms. Because we build and install them ourselves, nobody else has to be hired for the steel.
Call (252) 414-5105
Get a Free Quote
Making the building, hauling it to your site and putting it up are all ECOP’s work. There is no need to arrange a builder or a contractor of your own for the steel. For questions, dial (252) 414-5105.
A workshop beside Western Blvd and a storage building out near Richlands need different layouts. Each is priced for the width, length and doors you choose, and none comes from a kit PDF.
With a clear-span frame the floor stays open, which leaves room for lifts, trailers and workbenches. If the job calls for it, you can add insulation, wainscot or lean-tos.
A site inside a radius of 100 miles around any ECOP lot gets delivery at no charge, and the roll-forming plant is in Farmville. Phone (252) 414-5105, or find the Greenville lot at East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834.
Size and color are what most people think about first, but three earlier decisions do more to determine whether you are still pleased with the building ten years from now. The first is the site. Look for the highest, best-drained ground that you can still reach easily, and measure how far it sits from the property lines, the well and the septic field. The second is the use. List everything the building will hold in the five years ahead, counting the things you have not bought yet. The third is the rules, which the next section covers.
Then the building itself falls into place. Width and length come from what you plan to store and leg height from the tallest item on the list. Roof style depends on how much debris lands on it, and a vertical roof copes best with rain, leaves and pine needles. Put the doors where the driveway runs, not where they would look balanced.
Take your list to the lot, or type it into the quote form, and we will come back with a real number.
Begin with a phone call to the Onslow County inspections office. Ask which permit a building of your size requires, what drawings must go with the application, and whether your parcel is in a flood zone. Wind is why drawings matter here: the closer a site is to the ocean and the sounds, the stronger the design wind, so certification, framing and anchoring that an inland site could skip are often required. Expect the office to ask for certified drawings, and your insurer may ask as well, which is a good reason to request them early.
Next, pull up the flood map for your parcel. The reason is Florence in 2018: days of rain, followed by a surge that sent rivers into neighborhoods that had never flooded. A mapped flood zone changes the job, because pad height and anchoring then count for as much as the building. Near the water, a CAMA permit may also be required on top of the county’s.
Many buyers in Jacksonville, home to MCAS New River and Camp Lejeune, know they may get orders. Salt air works slowly; rinse the panels a couple of times a year and touch up fasteners and trim.
No. We make the building, deliver it and set it up, so you hire nobody else for the steel. Call (252) 414-5105.
East Carolina Outdoor Products sells them; the number is (252) 414-5105. The steel is formed in Farmville and brought to sites across Onslow County.
Yes. Start by telling us the width and length you prefer, the door sizes and whether certification is needed.
When your inspector requires certified drawings, we provide them. We will also say clearly which parts of the process we do not cover.
Yes. Anything inside 100 miles qualifies, and most of Onslow County lies within that distance.
All we need is a size, a county and a list of what will be stored. Our quotes are based on what steel costs at the moment, you owe us nothing for asking, and if another size would suit you better, we will say so.