Our crew erects it
No separate contractor is needed to put up the steel building. That job is ours.
The mistake people make with a metal building in Morehead City, NC is deciding in the wrong order. Size and color come to mind first, yet they should come last. What settles whether you are glad of the building ten years from now is decided earlier: where it stands, what the county requires and what it will hold. We form the steel in Farmville and deliver it to coastal commercial sites, boat storage and shops across the Crystal Coast and Carteret County, including Newport, Beaufort NC, Atlantic Beach and Morehead City itself. Our own crew installs it, so there is no contractor to hire for the steel building.
Call (252) 414-5105
Get a Free Quote
Farmville is where the panels are formed. From there we handle the delivery and the installation too, so nobody else has to be hired for the steel structure. Call (252) 414-5105.
Give us your width, length and doors and we will price the building around them, allowing for the wind and salt air of Carteret County. Along the US 70 corridor the typical jobs are contractor yards, boat barns and shop floors, in Beaufort NC and Newport as well as here in Morehead City.
With no posts in the way, there is room around a lift, space to back a trailer in and a place for a boat, and lean-tos can be added. If you are weighing an installed building against a kit, compare what each price covers and what the rent-to-own and no-credit-check terms include.
Delivery costs nothing within 100 miles. Phone (252) 414-5105, or stop by the sales lot at East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834.
Three questions come ahead of any measurements. Where will the building stand? Look for the part of the lot that is highest and best drained but still easy to reach, and mark off the well, the septic field and the property lines. What does the county want? Put two questions to its inspections office: which permit a building of this size needs, and which drawings. Ask, too, whether your parcel lies in a flood zone. What will it hold? Write out everything it will store over the next five years, including purchases you have yet to make.
Those answers settle most of the design. What you store decides the width and length, the tallest item decides the leg height, and the debris that will land on the roof helps decide its style. Rain, leaves and pine needles run off a vertical roof better than any other. Doors belong where the driveway comes in, even if that spoils the symmetry.
Take the list to our lot, or send it with a quote request, and we will return a real number.
On Bogue Sound, Morehead City is a port town where nearly everyone owns a boat or has a friend who does. Anyone building near that much salt water should start with the ground: pick the highest, best-drained part of the lot, then find out whether it lies inside a mapped flood zone. If it does, pad height and anchoring carry as much weight as the steel itself, and close to the shore a CAMA permit may be needed in addition to the county’s.
Florence, in 2018, is the storm residents still use as the yardstick. It rained for days, and the surge drove river water into neighborhoods that had never seen a flood. Wind is the other half of the problem. Design wind speeds climb nearer the ocean and the sounds, so a buyer a hundred miles inland might skip the framing, anchoring and certification that Carteret County often requires. Request certified drawings at the start; its inspections office will expect them, and your insurer might ask for them too.
Salt air attacks the steel more slowly than a storm does. Wash the panels twice a year and touch up the fasteners and trim, and the building should outlast most of what you park inside it.
Not for the steel. We manufacture the building, deliver it and set it up. Call (252) 414-5105.
ECOP does. Call (252) 414-5105. The steel comes out of our Farmville plant, and you can walk in to see buildings at our Greenville sales lots.
Yes. Bring the width, length and doors you have in mind. We welcome parcels in Carteret County and along the Crystal Coast.
Yes. We supply them whenever the coastal inspectors in Carteret County require them, and it helps to ask early.
Yes. Newport, Morehead City, Beaufort NC and Atlantic Beach are all within 100 miles, so delivery is free.
Send your width, your county and what the building will hold. The price comes from current steel costs and carries no obligation. If another size would fit the job better, we will tell you.