Twenty lots statewide
They run from the coast to the mountains, so you can walk through a building before you buy.
Picking among metal buildings in North Carolina is easier once you’ve walked through a finished one. That’s the reason we sell from twenty lots, spread from the Outer Banks to the mountains, with a walk-in lot in Greenville among them. We roll-form the panels at our Farmville plant and supply commercial structures, barns, shops and garages. Go to the lot nearest you, step inside one, and only then commit.
Call (252) 414-5105
Get a Free Quote
Most metal buildings sold in North Carolina come from national companies with no premises here: you configure a building online, pay, and a crew you’ve never met turns up. Our lots turn that around. You can step into the size you’re weighing, see the gauge and trim for yourself, and talk with someone who’ll still be here next year. It’s a different kind of purchase.
In Eastern North Carolina the concerns are salt air and hurricane wind loads, and coastal counties insist on certification that inland counties don’t. The Piedmont is gentler on a building. Up in the mountains it’s freeze-thaw cycles and snow load, which move our roof advice toward vertical panels. A quote that uses one specification for the whole state hasn’t looked at where your building will stand.
In the east we have lots in Ahoskie, Elizabeth City, Farmville, Gates County, Greenville, Kinston, New Bern, Pamlico County, Richlands/Jacksonville, Swansboro, Washington and Wilson. In central and western North Carolina they’re in Mocksville, Newton Grove, Richfield, Salisbury, Sparta, Statesville and Stokesdale. From each of these lots, delivery and installation are free within 100 miles.
Before you think about size or color, put three questions to yourself. Where will it sit? Look for ground that’s high, drains well and still lets a truck reach the door, then measure the setbacks from your boundary, from the well and from the septic field. What does the county require? Phone the inspections office to learn which permit and drawings a building this size calls for, and whether the parcel lies in a flood zone. What will it hold? Make a list that runs five years ahead and includes things you haven’t bought yet.
The answers set the building. What you store fixes the width and length, the tallest item fixes the leg height, and the amount of debris that will land on the roof helps decide the roof style: for leaves, pine needles and rain, a vertical roof works best. Put doors where the driveway meets the building, whatever that does to the symmetry. Bring your list to a lot or enter it in the quote form, and we’ll come back with a real number.
Ask your county first. It decides what certification the inspector wants to see, and in Eastern North Carolina the answer changes with the map: design wind speeds climb the closer you get to the coast from I-95, and flood zones trace every river and sound. That’s why we ask where the building is going before we ask what color it should be.
Few places on the East Coast see more tropical weather than we do, and people here can name the storms: Dorian in 2019, Florence in 2018, Matthew in 2016, Irene in 2011, Isabel in 2003 and Floyd in 1999. A few brought mostly wind, but most brought water, and the lesson that stuck is that no building is better than its anchoring and the ground under it. Tell us where yours will stand and we’ll price the frame, the anchors and the drawings to match.
ECOP does, at our plant in Farmville, where the panels are roll-formed. We sell from twenty lots around the state, and the Greenville sales lot is open to walk-ins. Plenty of companies advertising NC metal buildings are national dealers with no premises here. Call (252) 414-5105.
Usually, yes, for a permanent building on a foundation, though requirements differ from county to county. Wind-load rules apply in the coastal counties and not inland. If the building inspector wants certified engineered drawings, we supply them.
The size, leg height, roof style, openings and any certification requirement all affect the price. We work from what steel coil costs right now, not from a fixed list. Give us your dimensions through the quote form and a real number comes back within 24 hours.
Yes, and that’s the point of having twenty lots. You can walk through the size you have in mind, inspect the gauge and trim, and talk to someone local. That access is the biggest benefit of dealing with a company that has premises in North Carolina.
Give us the dimensions, the county and what the building is for. We price from current steel costs, asking creates no obligation, and we’ll recommend a different size if it would suit you better.