Our crew puts it up
We build and install the building ourselves, so the steel needs no separate contractor.
A shop floor with room for a lift and a trailer, dry storage for equipment, a building at the back of the property: those are the uses we price metal buildings in Richmond, VA for. The steel is roll-formed in Farmville, NC and delivered across the area, including Chesterfield and Henrico, which we quote as a market of its own, apart from Norfolk. We put the building up ourselves, so no separate contractor is needed for the steel.
Call (252) 414-5105
Get a Free Quote
We make the building, deliver it and put it up, so no builder or contractor is needed for the steel. To get started, phone (252) 414-5105.
We price a building to the width, length and door package you choose. Around Chesterfield and Henrico, and along I-95 and I-64, the typical uses are shop floors, storage and contractor yards in the denser capital metro. These quotes are written for Richmond itself, not carried over from a Norfolk job.
A clear span keeps the floor open for lifts, trailers and equipment, and a lean-to can be added when you need more room. When you compare offers, set our installed price beside a kit price, and ask what rent-to-own with no credit check actually covers.
Any site within 100 miles of an ECOP lot gets free delivery and professional setup. The lot nearest Richmond is our Gates County, NC lot at 11 US 13 in Eure, roughly 85 miles away, so most Richmond sites are covered. Phone (252) 414-5105 and we will check your address. Our address is East Carolina Outdoor Products, 1046 Greenville Blvd SW, Greenville, NC 27834, and the Greenville lot is walk-in only. The plant itself is in Farmville, NC.
Start with an inventory. Write down everything the building will hold over the next five years, counting the things you do not own yet. The list sets the width and length, the tallest item sets the leg height, and the debris that will land on the roof sets the roof style: no style clears rain, leaves and pine needles better than a vertical roof.
Next, call the inspections office and ask what permit and drawings a building your size requires. Then choose the site: ground that is high, drains well and is still easy to reach, with the setbacks from your property lines, your well and your septic field worked out. Put the doors where the driveway is rather than where they look symmetrical. Most people begin with size and color, but the questions above should come ahead of them. Bring the list to a lot or enter it in the quote form, and we will give you a real number.
Richmond stands at the falls of the James River, the line where Piedmont clay ends and coastal plain sand begins. Heading south toward the North Carolina border, the ground can swap from one to the other within a few miles, so find out which one is under your pad. Clay calls for attention to runoff, and sand calls for attention to anchoring. On either, the best money you can spend on a steel building goes into a compacted, well-drained pad.
Storms in this part of Virginia are mostly about rain. Franklin’s downtown went under water in 1999, when the Blackwater River rose in the wake of Floyd, and the remains of tropical systems can still swell the James, Appomattox, Meherrin and Nottoway rivers. Check the flood map if your site is near any of them. The rest of the list is summer humidity, winter ice and wind blowing across open farmland, which is why peanut, cotton and timber operations here have long favored clear-span steel.
No builder is needed for the steel building, because we make it, bring it and erect it. Phone (252) 414-5105.
Call ECOP at (252) 414-5105. The steel is formed in Farmville, NC, and the lots in Greenville, NC exist for sales and nothing else. We do deliver to Richmond, and you can request a delivery quote when you call.
No. The plant is in Farmville, NC, and that is where the steel is manufactured. Greenville, NC has sales lots only. Call (252) 414-5105.
Not if your site is within 100 miles of an ECOP lot. The Gates County lot in Eure, NC is about 85 miles from Richmond, so most Richmond sites fall inside that range. To be sure about yours, phone (252) 414-5105. A site beyond it is still delivered from Farmville, and the cost is quoted to you.
Yes, on qualifying buildings. Ask us at (252) 414-5105.
Give us a rough size, the county the building will stand in and what it has to hold. Our price comes from steel costs on the day you ask. There is no obligation, and if a different size would suit you better, we will say so.