We build it too
Our crews erect the steel building, so there is no separate contractor to hire.
The usual mistake with a metal workshop in Beaufort, NC is ordering the shell first and thinking about heat, air and headroom afterward. You avoid it by settling how the shop will be used before you settle its size, and by walking a real footprint before you commit. Shops here have to take Crystal Coast humidity and wind, and most buyers want clear-span space for boats, tools and general coastal-plain work.
The steel is 29-gauge, roll-formed at our Farmville plant. The walk-in lot in Greenville, 1046 Greenville Blvd SW, lets you walk a footprint first, before anything is delivered to Beaufort or the rest of Carteret County. Our crews build and install the workshop too, so the steel building needs no separate contractor. Delivery and setup are free inside 100 miles, from Eastern NC into Eastern SC and Eastern VA. Phone (252) 414-5105 or send in the quote form; dollar figures are not posted on our site.
Call (252) 414-5105
Get a Free Quote
Your metal workshop is manufactured, delivered and installed by us, wherever it is going in Beaufort or Carteret County. The steel building itself needs no outside builder or contractor, because building it and setting it up are our job. Call (252) 414-5105.
Clear spans leave room for benches, lifts and inventory. Doors can be walk-through or roll-up, wherever the work calls for them, and the eave height is chosen for your equipment. We also offer certified packages for the cases where Carteret County, or your insurance company, asks for one.
The roll-forming line and the rest of our manufacturing are in Farmville, never in Greenville. Greenville is where our walk-in lot and address are, at 1046 Greenville Blvd SW, Greenville, NC 27834, under the name East Carolina Outdoor Products. Walk through a sample there, and delivery to Beaufort follows. Reach us at (252) 414-5105.
New Bern, Jacksonville, Havelock, Newport, Morehead City and Atlantic Beach, along with the rest of Eastern NC, all fall inside our free delivery area. If you are interested in a kit, a building we already have for sale or rent-to-own, ask us; rent-to-own needs no credit check when a building qualifies.
Heat and air usually decide whether a shop gets used or avoided in summer. From June through September, a steel building with no insulation is uncomfortable by mid-morning once the sun is on it. Insulating the roof is the minimum. After that, choose a pale roof color, add vents at the ridge or in the gables and, where the site allows, put a roll-up door in each of two opposite walls so a breeze can pass straight through.
Think through the floor and the ceiling too. The slab should be thicker under anything heavy, such as a lift, and if you want outlets away from the walls, ask for conduit to be laid before the concrete is poured. As for height, a twelve-foot leg seems plenty until shelving, a mezzanine or a two-post lift is on the list. Extra headroom is cheap if you order it with the building and costly to add afterward.
The pad comes first. Check your lot against the flood map: if it falls in a mapped zone, how high the pad sits and how the building is anchored are as important as the steel above them. Florence in 2018 is the storm people here still measure others by, with days of rain and a storm surge that drove rivers into neighborhoods with no history of flooding. Beaufort, among the oldest towns in the state, has dealt with coastal storms since the early 1700s.
Being this close to salt water also changes the specification. Design wind speeds climb the nearer you get to the ocean or the sounds, so the framing, the anchoring and the certification are often required here, though they might be optional far inland. Get certified drawings lined up at the start: the Carteret County inspections office will expect them, and your insurer may too. Near the water there can be a CAMA permit as well, in addition to the county’s.
Salt air works slowly. Rinse the panels twice a year, keep fasteners and trim touched up, and the steel should outlive most of what you store inside it.
We can. We manufacture in Farmville and keep lots in Greenville, then deliver and install across Beaufort and the rest of Carteret County. Phone (252) 414-5105.
No. We build and install the steel building ourselves. Call (252) 414-5105.
No. Every workshop is manufactured in Farmville. The Greenville lot exists for walk-in visitors.
The size, the height, the doors and certification all count. Dollar figures are not posted on our site, so phone (252) 414-5105 or send in the quote form.
Yes, for buildings that qualify. Bring it up when you phone or when you send in the quote form.
Describe the workshop you have in mind: its size, the county it will stand in and what it will hold. Our figure reflects current steel pricing, asking obliges you to nothing, and if a larger or smaller shop would fit your needs better, we will say so.