Drawn before it is cut
The loads are calculated and every member sized first.
If you need a clear floor for a shop, a barn or a warehouse, and you want the structure settled before a crew arrives, pre-engineered metal buildings were made for the job. The whole building is designed as one system up front: the loads are calculated, every member is sized and each connection is detailed before a panel is cut. Nothing remains to be decided at the building site, which is why a PEMB goes up quickly and behaves predictably, and why it is straightforward to take through permitting.
Call (252) 414-5105
Get a Free Quote
In conventional construction a building is designed first and then handed to a builder, who works out how to put it together. A pre-engineered metal building, which people in the trade shorten to PEMB, flips that sequence. Every part of the system is engineered together as a single package before fabrication begins. The loads that wind and snow place on the building at your location are calculated, the framing is sized to carry those loads and nothing heavier, each joint is detailed, and each component is built to fit. What arrives is a set of parts designed to fit one another, not a stack of steel that must be puzzled out on site.
Three things do the work. Each member is sized to the load it carries, so there is no steel bought just in case. Joints are detailed ahead of time, which speeds erection and trims labor. And a single round of engineering serves a whole standardized system, so nobody pays for a one-off structural design on a building that never needed one. Taken together, they explain why PEMB is the dominant approach to light commercial and agricultural building across the Southeast.
Warehouses, shops, garages, barns and light manufacturing are the natural uses, and so is any project where an open floor counts for more than an elaborate design. Buildings with complicated geometry, heavy masonry worked into the structure or unusual structural demands are a poorer match. If yours is one of those, we would rather say so than sell you a pre-engineered system that fights the design the whole way.
The drawings we certify are specific to the jurisdiction in which the building will be raised, since design wind loads on the Carolina coast differ from those in the Piedmont. Our sealed engineering goes to the plan reviewer. Whether the finished facility meets code remains the job of your architect or general contractor, and the foundation, occupancy, egress and utilities fall outside the steel package.
Ordering the steel is not the hard part of a commercial project. The delay comes from what the jurisdiction asks for before it issues a permit: drawings an engineer has sealed for your site, parking, stormwater and zoning approval. Raise those questions at the start, and the building itself then goes up in short order.
In coastal counties, design wind speeds run higher and flood elevation gets close attention. Both shape the framing and the foundation, so a real quote starts with the site address. Clear-span framing gives racking, vehicles and equipment an open floor, and the bays can be spaced so the doors land where you need them.
It also pays to plan for growth. A wall at one end can be designed so that it opens up later, and a lean-to can be closed in when more room is needed, so the business expands without a fresh start.
Start with the permit office, not the building. The county where you build decides which certification the inspector will ask to see, so get that answer first. Check the flood zone for your site too, because the zones trace every river and sound. And remember that design wind speeds go up as you head east from I-95 to the coast, so the answer can change from one lot to the next.
Eastern North Carolina gets more tropical weather than nearly anywhere else on the East Coast. Floyd (1999), Isabel (2003), Irene (2011), Matthew (2016), Florence (2018) and Dorian (2019) are all still fresh in memory. Some brought wind, but most brought water. What people here took from them is that a building is no better than its anchors and the soil under it.
We live here too, so questions about your site come before talk of colors. Give us the spot where the building is going and we will quote the framing, anchors and drawings for it.
Its whole design is finished before fabrication begins. The wind and snow loads at the site are worked out, each framing member is sized to match, and every connection is specified ahead of time, so the parts show up ready to fit and nothing is trimmed on the job. PEMB is the trade’s short name for it.
Pre-Engineered Metal Building. The name describes a design approach: the complete building is engineered as one package before anything is made. With conventional construction the structure is drawn first and the builder works out the assembly afterwards.
In most cases, yes, when the building is a warehouse, shop, garage or farm building. Each member is sized closely to its calculated load instead of being over-specified, and putting it up takes less labor. A design with complicated architecture is a different matter; the savings can vanish, and we will tell you plainly if yours is one.
The steel system is engineered for you as part of the package, and the certified, sealed drawings go to your local plan reviewer. What stays with your architect or general contractor is the foundation design, the site work and code compliance for the building as a whole.
Standard framing spans as much as 60′ with nothing in the middle of the floor, which meets the needs of most warehouses, shops and farm buildings. Tell us the clear width you want and we will say honestly whether it is within what we offer.
Give us the building size, the county where it will stand and what it has to hold. Our quotes are based on what steel costs at the moment, they carry no obligation, and we will point out when a different size would fit your needs better.