Check the setbacks
Ask the county how far the building has to stay from the road, the property line, any easement, the well and the septic system before you choose a spot.
In Eastern North Carolina, the foundation question is really a water question. Coastal and sound-side lots are sandy, with a high water table, while Piedmont clay swells when wet and shrinks as it dries; on either one the pad needs a compacted base and a route for water to drain away. A steel building goes up fast, so whatever is wrong with the site comes to light just as fast. A pad that is not level, a driveway too tight for a delivery truck, a tree limb above the roofline, or a boundary closer than the county permits can halt the crew on the day installation should have finished. What follows explains how to prepare your property before metal building construction starts, in the order that makes most of the work easy. Site preparation is the customer’s half of the job, and in NC, SC and VA these notes serve homeowners and contractors alike.
The short version
Start with the county: confirm setbacks and permits. Get the underground utilities marked, then clear and grade a level pad that extends beyond the building’s footprint. Put in whichever foundation the manufacturer specifies, arrange the drainage so water leaves the pad, and be sure the delivery truck and the installation crew can get onto the site.
Call (252) 414-5105
Get a Free Quote
The county’s rules decide where the building may stand, so begin there. Every county sets its own setbacks, and some vary them by zoning district: these are the required gaps between a structure and the property boundary, the roadway, any easement, the well and the septic system. A building put inside one of those gaps can be ordered moved. A call to the county’s planning or inspections office should also settle two other questions: does a building of this size and use need a permit, and must the drawings be certified and engineered? Before you buy, we will tell you if your site calls for certification; the county, though, makes the final decision. Members of a homeowners association should read its covenants as well, since limits on materials, colors and placement can be tighter than the county’s. Finally, check the records for easements. Land you own can still carry a utility or drainage easement that forbids building across it. Try to have every answer put in writing.
Nothing should be dug until the utility locating service has been called and the underground lines for power, gas, water and communications have been marked. After that, clear the building’s footprint and leave extra room all around it for the crew. Any limbs hanging over the roofline should come down, because they get in the way during installation and shed debris afterward. The pad has to be level. Put a building on a slope or an uneven surface and the frame will not come square, the doors will stick and the panel seams will not close tight. Piedmont clay expands when it is wet and contracts as it dries, so on that soil use compacted gravel beneath the foundation and shape the ground so water drains away from the pad. Wherever you build, the ground should fall away from the structure in every direction, and you should decide where the water coming off the roof will go, since a big roof gathers a lot of it. Sandy coastal ground drains faster, yet it still has to be compacted and drained.
Three things drive the choice: what the building is for, the anchoring that the manufacturer calls for, and what the county will inspect. Garages, shops and any building with a finished interior usually sit on a concrete slab, which has to be poured to the right dimensions, kept level and allowed to cure before installation begins. For carports and certain storage buildings, asphalt or bare ground can be enough with the correct type of anchor, though the surface has to be flat and compacted all the same. Plumbing changes the sequence: drain lines and sleeves have to be placed beneath the slab ahead of the pour. A building that will be finished inside may also need footings, with the slab made thicker under the points that carry the load. Get the exact slab measurements and the anchor specification from the manufacturer before any concrete work begins.
Expect the building to show up on a truck piled with long frame members and bundles of panels, with a crew that needs space to unload and work. Go over the approach between the road and the pad and look for anything that could stop a truck: overhead wires, gates that are too narrow, low branches, soft ground, sharp bends. A drive that carries your pickup every day may struggle under a loaded truck and trailer, particularly when clay is wet. When the pad is a long way from the road, work out in advance where the materials will be laid out. The crew also needs open ground around the whole footprint, since they stand the legs, lift the trusses and fasten the panels there. We deliver the building and install it, and neither costs anything when the site is no more than 100 miles from one of our 28 ECOP lots. Let the sales lot know of any access limits when placing your order, and delivery can be planned around them.
Put the steps in this order. The county comes first: setbacks, permits and covenants can all shift the building’s position, so settle them before anything else. Next, get the buried lines marked and prepare the pad, grading it so water drains. Ask the manufacturer for the foundation specification, then pour or build the base, adding plumbing and conduit under the slab where utilities are planned. Allow the concrete to cure. Clear the delivery route of whatever blocks it. Book the installation only after the pad is complete and has been inspected, if inspection is required. Raising the shell usually takes a matter of days, and then the electrical, plumbing, insulation and interior finishing are done by the customer’s own trades, which is where most of the time goes. Our quotes use current steel pricing and typically come back within 24 hours. To get one, call (252) 414-5105 or stop by any lot listed at /locations/. Weekday hours are 9am to 5pm, Monday through Friday, and on Saturday the lots are open from 9am to 1pm.
Foundation questions around here are mostly questions about water. Lots near the coast and the sounds are sandy and the water table is high, so the target never changes: raise the pad above the ground around it and let water leave.
For a garage or workshop that is closed in, a concrete slab makes the best floor. Order it to the measurements we supply, put a vapor barrier under it, and choose a thickness that suits whatever will be parked on top. Carports and farm buildings do well on a compacted gravel pad, which drains freely and costs much less. Bare ground with the right anchors is possible for certain buildings, though it leaves the least margin for error when the soil is soft or wet.
If you cannot tell which suits your lot, take a few pictures after it rains and send them over. That is the fastest way for us to judge what the ground needs.
Old wooden tobacco barns still lean in the fields along the back roads that run from Wilson toward the coast. Their tall, narrow shape came from curing leaf, and for a century they were the usual farm outbuilding in this part of the state. Steel has taken over, both on farms and behind houses, offering wide spans with no posts inside and a roof that sheds a summer thunderstorm easily.
The need for somewhere to store things has not changed, but what gets stored has. Now the space might hold a camper next to a bay boat bound for the Pamlico, a side-by-side kept for deer season, or whatever a sweet potato or peanut crop demands. If size is your question, pick out the longest item you own, leave enough space to walk around it, and then add another bay. Most of the regrets we hear are about building too small.
No. Some carports and storage buildings are held down with the proper anchors on compacted soil or asphalt. Garages, shops and anything with a finished interior normally get a concrete slab. The manufacturer decides which anchoring is acceptable for your building on your particular site.
Flat enough for the frame to come out square and the doors to hang properly. If the base slopes or is uneven, gaps open up under some of the legs and the structure gets twisted. Instead of trusting your eyes, ask the grader or the concrete contractor to measure it with a laser or a transit, and make sure the pad measurements agree with what was ordered.
That depends on the building, so get the exact slab dimensions from the manufacturer; the anchoring and the way the panels overhang fix where the edge falls. A slab that matches the footprint works for some buildings, while others call for a slim margin. Concrete poured to the wrong size is among the most common reasons an installation gets delayed.
The answer changes from county to county and with who does the work. In some places only the owner may apply, and in others the installer or a contractor can. Put the question to the inspections office, describing a manufactured steel building that will be installed on your property, and do it early.
Say so to the sales lot when you place the order. A long trailer needs space to turn, ground that will hold it, and no branches or wires in the way. Where the pad sits far from the road, the materials may be unloaded nearer the road; settling that beforehand means the delivery does not have to be moved to another day.
Tell us how big the building should be, which county it will stand in and what it must hold. The figure comes from steel pricing as it stands today and carries no obligation, and if a different size looks like a better fit, we will say so.