Steel Shop Buildings

ECOPM32

Built For Working In

Eave height is the one specification you cannot change once a building is up, so settle it first when you plan steel shop buildings. Door width and condensation control are the other two that decide whether a shop works, and all three have to be right at the time you order. When they are, the building works for twenty years. When the eaves are wrong, nothing can fix it.

Call (252) 414-5105

Get a Free Quote
Diverse Product Range

Eaves of 14′ and up

Meant for shops with lifts. Of all the specifications, only this one cannot be changed later.

Diverse Product Range

Clear span up to 60′

No posts standing in the middle of your floor.

Customize

A door at each end

A second door in the other gable lets vehicles drive straight through and changes how you work.

Diverse Product Range

Stopping condensation

Choose a vapor barrier or insulation when you place the order.

Diverse Product Range

Framed around your services

Say where power and air will go and we frame to suit.

money_1

Rent-to-own

A credit check is not required.

Long white metal building with black wainscot and a roll-up door

Pick the eave height for the tallest work you will ever do

A two-post lift needs about twelve feet of clearance to lift a vehicle, and a four-post lift with a car on it needs more. Once you allow for lighting and overhead lines, fourteen feet is the least a working shop should have, as opposed to a building you only park in. No other specification is as permanent: eave height cannot be altered after erection, and customers phone us about it more than anything else once the building is standing. If you are torn between two heights, go taller.

Large tan commercial metal building with a tall roll-up door

Size the doors for the biggest thing that will ever go through

A ten-foot door takes most vehicles. Twelve feet takes trucks with racks and most trailers. If you may one day own a dually pulling a fifth wheel, or a tractor with an implement mounted on it, measure it now and add clearance. A second door in the opposite gable means vehicles can pass straight through instead of backing out of a dead end, and the effect on how the space works is far bigger than the extra cost would suggest.

Finished metal shop interior with white liner panels and lighting

Why steel shop buildings drip when they are not insulated

Put an uninsulated steel roof over an unconditioned shop and it will sweat. At night, warm damp air touches the cold steel and the moisture condenses, so by morning it is dripping on your tools and your work. People get caught by this all over the Southeast, not only near the coast. Choose a vapor barrier or an insulation package when you order. A retrofit costs more and works less well than building it in from the start.

Long dark metal building with three large doors on a gravel lot

Tell us where the power and air will go

Running electrical or air lines is not something we do, but the position of openings and framing decides what your electrician can do at reasonable cost. Give us a rough idea of where the panel, the welder outlets and the compressor will sit, and we will place the framing and openings to suit. At the design stage this costs you nothing. Changing course later is expensive.

ECOPM40

Heat and air in a steel shop building

It is simple to buy a metal workshop and just as simple to buy the wrong one. Heat and air movement decide whether a steel workshop gets used all summer or gets left alone. Put an uninsulated steel building in full sun and, from June through September, it is uncomfortable to work in by mid-morning.

Insulate the roof as a bare minimum. Give the roof a light color, and fit ridge or gable vents so hot air has somewhere to escape. If the site permits, place roll-up doors in two facing walls and open both to draw a breeze through. Plan the slab around the work it will carry: pour thicker concrete wherever a lift or a heavy machine will stand, and lay conduit before the concrete goes in if you want outlets away from the walls.

Then think about height. Twelve-foot legs sound roomy until tall shelving, a mezzanine or a two-post lift enters the plan. Adding height costs the least at the order stage and the most afterward.

Dark green metal building with a roll-up door

Siting a steel shop on Eastern North Carolina ground

Start with the weather: go out right after a downpour and note where the water collects. East of I-95 everything is flat, with sandy loam over clay in most places and the water table within a few feet of the surface. Build the pad up instead of digging down, pack the fill in layers and shape it so water runs off by itself.

Anchors have to be chosen for sandy ground, and low ground can end up inside a mapped flood zone; check the county’s flood map before you commit to a spot. These counties are among the country’s best farmland, and they grow most of North Carolina’s sweet potatoes, which no other state out-produces. Planning before the slab goes in pays off on this soil, and with the pad and anchoring right, the shop will stay dry for decades.

Specifications

  • Widths: 24′ – 60′ clear span
  • Lengths: 30′ – 100’+
  • Eave heights: 12′ – 20′ (14’+ for lifts)
  • Doors: Roll-up to 20’+, sliding, personnel
  • Insulation: Vapour barrier and batt packages
  • Framing: 14ga and 12ga galvanized

Common Questions

How tall should the eaves be if I want a car lift in my shop?

A two-post lift needs about twelve feet of clear height to raise a vehicle all the way, and a four-post lift with a car on it needs more. With lighting and overhead lines allowed for, eaves of fourteen feet are a sensible minimum. Eave height cannot be raised after erection, so lean toward taller.

Which size of steel shop building suits me?

A 30’×40′ building gives you two bays with room for storage, and it is the size we quote most. A 40’×60′ building leaves space for several projects at once, a lift and a parts area. If you are caught between two sizes, adding length costs far less per square foot than adding width.

Is insulation really needed in a steel shop?

In the Southeast, yes, mainly to control condensation and not temperature. Bare steel over a shop that is not climate-controlled sweats overnight and drips on tools and on work in progress. Choose a vapor barrier or insulation when you order instead of waiting to retrofit.

What will a steel shop building cost me?

Size, eave height, doors and insulation all change the price, as does a county requirement for certification. We price from the current cost of steel coil. Phone (252) 414-5105 or send your dimensions, and a number reaches you within 24 hours.

A number for your shop within 24 hours

Tell us the footprint you want, the county, and the work the shop will house. We build the price from the current cost of steel, you owe nothing for asking, and if a different size would fit that work better we will say so.

Request a Quote Design It in 3D